Date: 10/25/18 Time: 22:48 |
||||||
Sample: 1957M01 2015M03 |
||||||
Included observations: 699 |
||||||
Autocorrelation |
Partial Correlation |
AC |
PAC |
Q-Stat |
Prob |
|
.|******* |
.|******* |
1 |
0.957 |
0.957 |
643.11 |
0.000 |
.|******| |
**|. | |
2 |
0.894 |
-0.267 |
1204.6 |
0.000 |
.|******| |
.|* | |
3 |
0.841 |
0.158 |
1702.0 |
0.000 |
.|******| |
*|. | |
4 |
0.788 |
-0.111 |
2139.5 |
0.000 |
.|***** | |
.|. | |
5 |
0.739 |
0.071 |
2525.0 |
0.000 |
.|***** | |
.|. | |
6 |
0.697 |
0.002 |
2868.0 |
0.000 |
.|***** | |
.|* | |
7 |
0.664 |
0.092 |
3179.9 |
0.000 |
.|***** | |
.|. | |
8 |
0.635 |
-0.025 |
3465.6 |
0.000 |
.|**** | |
*|. | |
9 |
0.599 |
-0.092 |
3720.0 |
0.000 |
.|**** | |
*|. | |
10 |
0.550 |
-0.133 |
3935.2 |
0.000 |
.|**** | |
.|. | |
11 |
0.502 |
0.033 |
4114.6 |
0.000 |
.|*** | |
.|. | |
12 |
0.458 |
-0.012 |
4264.3 |
0.000 |
Model selection
First Model
Automatic ARIMA Forecasting |
Selected dependent variable: SPREAD |
Date: 10/26/18 Time: 09:28 |
Sample: 1957M01 2015M03 |
Included observations: 696 |
Forecast length: 0 |
Number of estimated ARMA models: 2 |
Number of non-converged estimations: 0 |
Selected ARMA model: (1,0)(0,0) |
AIC value: 0.75597960146 |
Second Model
Automatic ARIMA Forecasting |
|
Selected dependent variable: SPREAD |
|
Date: 10/26/18 Time: 09:29 |
|
Sample: 1957M01 2015M03 |
|
Included observations: 696 |
|
Forecast length: 0 |
|
Number of estimated ARMA models: 3 |
|
Number of non-converged estimations: 0 |
|
Selected ARMA model: (2,0)(0,0) |
|
AIC value: 0.683346733664 |
|
Third Model
Automatic ARIMA Forecasting |
|
Selected dependent variable: SPREAD |
|
Date: 10/26/18 Time: 09:30 |
|
Sample: 1957M01 2015M03 |
|
Included observations: 696 |
|
Forecast length: 0 |
|
Number of estimated ARMA models: 4 |
|
Number of non-converged estimations: 0 |
|
Selected ARMA model: (3,0)(0,0) |
|
AIC value: 0.660012693068 |
|
On the basis of the results from the above table, the AIC is lowest for the third model with three lags. So the best model is the third model.
Plotting the ACF and PCF for the Preferred Model
Date: 10/26/18 Time: 09:31 |
||||||
Sample: 1957M01 2015M03 |
||||||
Included observations: 696 |
||||||
Autocorrelation |
Partial Correlation |
AC |
PAC |
Q-Stat |
Prob |
|
.|******* |
.|******* |
1 |
0.957 |
0.957 |
640.22 |
0.000 |
.|******| |
**|. | |
2 |
0.894 |
-0.265 |
1199.3 |
0.000 |
.|******| |
.|* | |
3 |
0.840 |
0.155 |
1694.5 |
0.000 |
.|******| |
*|. | |
4 |
0.788 |
-0.106 |
2130.3 |
0.000 |
.|***** | |
.|. | |
5 |
0.739 |
0.063 |
2514.1 |
0.000 |
.|***** | |
.|. | |
6 |
0.696 |
0.005 |
2855.3 |
0.000 |
.|***** | |
.|* | |
7 |
0.663 |
0.085 |
3165.0 |
0.000 |
.|***** | |
.|. | |
8 |
0.633 |
-0.017 |
3448.4 |
0.000 |
.|**** | |
*|. | |
9 |
0.597 |
-0.099 |
3700.3 |
0.000 |
.|**** | |
*|. | |
10 |
0.549 |
-0.122 |
3913.4 |
0.000 |
.|**** | |
.|. | |
11 |
0.501 |
0.038 |
4091.7 |
0.000 |
.|*** | |
.|. | |
12 |
0.459 |
-0.006 |
4241.5 |
0.000 |
To calculate the Ljung-Box for the residuals we have to use the chi square test. The Q statistics is used to test following null hypothesis:
Null hypothesis:
There is no autocorrelation up to order k:
On the basis of the results from the ACF and PACF, all the p values are less than 0.05. So, the null hypothesis can be rejected. So There is autocorrelation in the order 5 as mentioned.
Automatic ARIMA Forecasting |
|
Selected dependent variable: SPREAD |
|
Date: 10/26/18 Time: 07:50 |
|
Sample: 1957M01 2012M12 |
|
Included observations: 672 |
|
Forecast length: 0 |
|
Number of estimated ARMA models: 4 |
|
Number of non-converged estimations: 0 |
|
Selected ARMA model: (1,1)(0,0) |
|
AIC value: 0.677963363957 |
Model Selection Criteria Table |
||||
Dependent Variable: SPREAD |
||||
Date: 10/26/18 Time: 07:50 |
||||
Sample: 1957M01 2012M12 |
||||
Included observations: 672 |
||||
Model |
LogL |
AIC* |
BIC |
HQ |
(1,1)(0,0) |
-223.795690 |
0.677963 |
0.704810 |
0.688361 |
(1,0)(0,0) |
-260.215708 |
0.783380 |
0.803515 |
0.791178 |
(0,1)(0,0) |
-699.965715 |
2.092160 |
2.112295 |
2.099958 |
(0,0)(0,0) |
-1091.533293 |
3.254563 |
3.267987 |
3.259762 |
The results from the AR (1,1) models is shown in the table above
Automatic ARIMA Forecasting |
|
Selected dependent variable: SPREAD |
|
Date: 10/26/18 Time: 07:59 |
|
Sample: 1957M01 2015M03 |
|
Included observations: 696 |
|
Forecast length: 0 |
|
Number of estimated ARMA models: 4 |
|
Number of non-converged estimations: 0 |
|
Selected ARMA model: (3,0)(0,0) |
|
AIC value: 0.660012693068 |
|
Model Selection Criteria Table |
||||
Dependent Variable: SPREAD |
||||
Date: 10/26/18 Time: 07:59 |
||||
Sample: 1957M01 2015M03 |
||||
Included observations: 696 |
||||
Model |
LogL |
AIC* |
BIC |
HQ |
(3,0)(0,0) |
-224.684417 |
0.660013 |
0.692666 |
0.672638 |
(2,0)(0,0) |
-233.804663 |
0.683347 |
0.709469 |
0.693447 |
(1,0)(0,0) |
-260.080901 |
0.755980 |
0.775572 |
0.763555 |
(0,0)(0,0) |
-1125.854148 |
3.240960 |
3.254022 |
3.246011 |
Forecast Evaluation |
||||||
Date: 10/26/18 Time: 08:02 |
||||||
Sample: 1957M01 2015M03 |
||||||
Included observations: 699 |
||||||
Evaluation sample: 1957M01 2015M03 |
||||||
Training sample: 1957M01 2012M12 |
||||||
Number of forecasts: 2 |
||||||
Combination tests |
||||||
Null hypothesis: Forecast i includes all information contained in others |
||||||
Forecast |
F-stat |
F-prob |
||||
SPREAD |
NA |
NA |
||||
Evaluation statistics |
||||||
Forecast |
RMSE |
MAE |
MAPE |
SMAPE |
Theil U1 |
Theil U2 |
SPREAD |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
MSE ranks |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
Dependent Variable: SPREAD |
||||
Method: ARMA Maximum Likelihood (OPG – BHHH) |
||||
Date: 10/26/18 Time: 08:51 |
||||
Sample: 2013M01 2014M12 |
||||
Included observations: 24 |
||||
Failure to improve objective (non-zero gradients) after 106 iterations |
||||
Coefficient covariance computed using outer product of gradients |
||||
Variable |
Coefficient |
Std. Error |
t-Statistic |
Prob. |
C |
-2.370419 |
0.141478 |
-16.75472 |
0.0000 |
AR(1) |
0.233121 |
0.562167 |
0.414683 |
0.6851 |
AR(2) |
1.137205 |
0.640238 |
1.776223 |
0.0991 |
AR(3) |
0.190303 |
0.734960 |
0.258930 |
0.7997 |
AR(4) |
-0.830724 |
0.628845 |
-1.321031 |
0.2093 |
MA(1) |
0.572083 |
3.782041 |
0.151263 |
0.8821 |
MA(1) |
0.577825 |
11.81595 |
0.048902 |
0.9617 |
MA(2) |
-0.424238 |
8.292924 |
-0.051157 |
0.9600 |
MA(3) |
-0.985814 |
17.48258 |
-0.056388 |
0.9559 |
MA(4) |
-0.167773 |
3.705652 |
-0.045275 |
0.9646 |
SIGMASQ |
0.013356 |
0.285408 |
0.046795 |
0.9634 |
R-squared |
0.871241 |
Mean dependent var |
-2.410000 |
|
Adjusted R-squared |
0.772195 |
S.D. dependent var |
0.328991 |
|
S.E. of regression |
0.157024 |
Akaike info criterion |
-0.250678 |
|
Sum squared resid |
0.320534 |
Schwarz criterion |
0.289263 |
|
Log likelihood |
14.00814 |
Hannan-Quinn criter. |
-0.107432 |
|
F-statistic |
8.796349 |
Durbin-Watson stat |
2.187936 |
Dynamic forecasting
Automatic ARIMA Forecasting |
Selected dependent variable: SPREAD |
Date: 10/26/18 Time: 09:15 |
Sample: 1957M01 2015M03 |
Included observations: 696 |
Forecast length: 0 |
Number of estimated ARMA models: 4 |
Number of non-converged estimations: 0 |
Selected ARMA model: (0,0)(0,0) |
(0,0)(0,0) |
Dependent Variable: SPREAD |
||||
Method: Least Squares |
||||
Date: 10/26/18 Time: 09:15 |
||||
Sample (adjusted): 1957M01 2014M12 |
||||
Included observations: 696 after adjustments |
||||
Variable |
Coefficient |
Std. Error |
t-Statistic |
Prob. |
C |
-1.519009 |
0.046269 |
-32.83010 |
0.0000 |
R-squared |
0.000000 |
Mean dependent var |
-1.519009 |
|
Adjusted R-squared |
0.000000 |
S.D. dependent var |
1.220654 |
|
S.E. of regression |
1.220654 |
Akaike info criterion |
3.238087 |
|
Sum squared resid |
1035.548 |
Schwarz criterion |
3.244617 |
|
Log likelihood |
-1125.854 |
Hannan-Quinn criter. |
3.240612 |
|
Durbin-Watson stat |
0.084520 |
|||
Model Selection Criteria Table |
||||
Dependent Variable: SPREAD |
||||
Date: 10/26/18 Time: 09:15 |
||||
Sample: 1957M01 2015M03 |
||||
Included observations: 696 |
||||
Model |
LogL |
AIC |
BIC |
HQ |
(0,0)(0,0) |
-1125.854148 |
3.240960 |
3.254022 |
3.246011 |
(0,1)(0,0) |
-719.672654 |
2.076646 |
2.096238 |
2.084221 |
(1,0)(0,0) |
-260.080901 |
0.755980 |
0.775572 |
0.763555 |
(1,1)(0,0) |
-222.593793 |
0.651132 |
0.677254 |
0.661232 |
Forecast Evaluation |
|||||||
Date: 10/26/18 Time: 09:18 |
|||||||
Sample: 2013M01 2015M03 |
|||||||
Included observations: 27 |
|||||||
Evaluation sample: 2013M01 2015M03 |
|||||||
Training sample: 1957M01 2012M12 |
|||||||
Number of forecasts: 3 |
|||||||
Combination tests |
|||||||
Null hypothesis: Forecast i includes all information contained in others |
|||||||
Forecast |
F-stat |
F-prob |
|||||
SPREAD |
NA |
NA |
|||||
Evaluation statistics |
|||||||
Forecast |
RMSE |
MAE |
MAPE |
SMAPE |
Theil U1 |
Theil U2 |
|
SPREAD |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
|
Mean square error |
NA |
NA |
NA |
NA |
NA |
NA |
|
MSE ranks |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
0.000000 |
|
On the basis of results from the forecasting it can be said that the spread is going to decline for some time and then increase after 2014. In terms of the forecasting accuracy, the original series do not show any trend, however the results from forecasting is continuously declining after 1957.
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download