Kv =
Substitution of H = 600 mm, H1 = H2 = H3 = 200 mm K1 = 5 * 10-3, K2 = 4.2 *10-2 and K3 = 3.96 * 10-4
Determine the quantity of water flowing through the sample per hour.
Kv =
= 1.076 * 10-3 cm/sec
Quantity of water flowing through the sample
q = Kv*i*A
= Kv*i*
i is the hydraulic gradient, A = cross section area of soil
substitute 47/60 for I and d = 15 cm
q = 1.076 * 10-3 * 47/60 *
= 0.1489 cm3/sec
= 536.04 cm3/hr
The quantity of water flowing through the sample per hour = 536.04 cm3/hr
b)
Calculate when x = 0
Pressure head is zero, because above the datum line Y – Y there is no water pressure
The value of Z is -220 mm
Calculate the total head at entrance and exit of each layer using the equation
h =
Elevation head is Z, pressure head is
h = 0 + 470
= 470 mm
Therefore, the total head is 470 mm
Calculate when x = 200 mm
Pressure head is zero, because above the datum line Y – Y there is no water pressure
The value of Z is -220 mm
Calculate the total head at entrance and exit of each layer using the equation
h =
here, elevation head is Z, pressure head is
Equate the discharge velocities
Kv = K1 * i1
(1.076 * 10-3) * 47/60 = 0.005*
0.00084 = 2.5 * 10-5
h = 470 – 33.7
= 436.29 mm
Calculate the value of
= 436.29 + 220
656.29 mm
the total head is 656.29 mm
Calculate when X = 400 mm
Pressure head is zero because the datum line Y – Y there is no water pressure
The value of Z is -220 mm
Equate the discharge velocities
Kv = K1 * i1
1.076 * 10-3 * 47/60 = 0.042 *
0.00084 = 2.1 * 10-5
h = 436.29 – 4
= 432.29 mm
Calculate the value of
= 432.29 + 220
652.29 mm
the total head is 652.29 mm
Calculate when x = 600 mm
Pressure head is zero because the datum line Y – Y there is no water pressure
The value of Z is -220 mm
Equate the discharge velocities
Kv = K1 * i1
1.076 * 10-3 * 47/60 = 0.00039 *
0.00084 = 1.95 * 10-4
h = 436.29 – 432.24
= 0 mm
Calculate the value of
= 0 + 220
200 mm
the total head is 200 mm
d) discharge velocity = ki
k = hydraulic conductivity of the soil and I hydraulic gradient
k = 0.001076
v = 0.001076 * 47/60
= 0.000843 cm/sec
Calculation of the seepage velocity by using the equation
Vs = V/n
For soil I
V = 0.000843 and n = 0.5
Vs = 0.000843/0.5
= 0.00168 cm/sec
For soil II
V = 0.000843 and n = 0.6
Vs = 0.000843/0.6
= 0.0014 cm/sec
For soil III
V = 0.000843 and n = 0.33
Vs = 0.000843/0.33
e)
calculation of the height in A
height = (pressure head at X)200 mm
= 656.29 mm
Therefore, the height of water in A is 656.29 mm
Calculate the height of water in B
height = (pressure head at X)400 mm
= 652.29 mm
Therefore, the height of water in A is 652.29 mm
Q2)
The plane stress in XY plane, z = 0 and ZX = XZ =ZY =YZ = 0
Sum forces in the x1 direction
1*A*sec
Sum forces in the y1 direction
x1y1 *A*sec
xy = yx, simplified
1 = x*cos2 + y*sin2 + 2*xy*sin
x1y1 = -(x –y) sin + xy(cos2
Using the trigonometric identities
sin
1 =
1face, substitution of
[2 + xy2
Cos2
Sin2
Substituting for R and rearranging
Larger principles
Sc-clay =
Cc compression index
0 is the effective overburden pressure
Bearing capacity of clay
q =
where
q = 19 * 2 = 38 kN/m2
calculation of m1
m1 = L/B
L = B = 10 m
m1 = 10/10 = 1
Calculation of value of b
b = B/2
B = 10 m
b = 10/2 = 5 m
consider a clay layer of different depths from fill load = z
let z = 4, 6, 8
for z = 4
n1 = z/b
b = 5m and z = 4
n1 = 4/5
= 0.8
Tabulate the value for different z and calculate the increase in effective stress
m1 |
Z (m) |
b = B/2 |
n1 = z/b |
q |
I4 |
|
1 |
4 |
5 |
0.8 |
38 |
0.8 |
30.4 |
1 |
6 |
5 |
1.2 |
38 |
0.606 |
23.02 |
1 |
8 |
5 |
1.6 |
38 |
0.449 |
17.06 |
0 = 2 * 15 + 2*17 + 4/2 *18 –[(2 +2) *9.81]
Calculate the settlement of clay layer due to one dimensional consolidation
e0 = 1.1, , Cc = 0.36
Sc-clay =
=
= 0.096 m
Calculation of the settlement of peat layer
Sc-clay =
Cc compression index
0 is the effective overburden pressure
Bearing capacity of clay
q =
where
q = 19 * 2 = 38 kN/m2
calculation of m1
m1 = L/B
L = B = 10 m
m1 = 10/10 = 1
Calculation of value of b
b = B/2
B = 10 m
b = 10/2 = 5 m
consider a clay layer of different depths from fill load = z
let z = 8, 9, 10
for z = 8
n1 = z/b
b = 5m and z = 8
n1 = 8/5
= 1.6
Tabulate the value for different z and calculate the increase in effective stress
m1 |
Z (m) |
b = B/2 |
n1 = z/b |
q |
I4 |
|
1 |
8 |
5 |
1.6 |
38 |
0.449 |
17.06 |
1 |
9 |
5 |
1.8 |
38 |
0.388 |
14.74 |
1 |
10 |
5 |
2.0 |
38 |
0.336 |
12.76 |
Calculate the settlement of peat layer due to one dimensional consolidation
e0 = 5.9, , Cc = 6.6, H = 2 m
Sc-clay =
=
= 0.136 m
Sc = Sc-clay + Sc-peat
Sc = 0.096 + 0.136
= 0.232 m
Total consolidation settlement = 0.232 m
calculation of time for 99% primary consolidation using the formula
t99-clay =
Here,the maximum drainage path is Hdr,the time factor is T99, and the coefficient of consolidation is cv.
For the clay layer, a drainage condition is assumed since the top is silty sand which has a high permeability and the bottom is a peat layer has a high void ratio and considerable permeability.
For double drainage condition,
Hdr=
=2m
=200cm
For 99% degree of consolidation.
Variation of Tv with U. T99=1.781.
Substitute 200cm for Hdr. 1.781 for T99. And 0.003cm2/sec for Cv.
t99-peat=
23,746,666s*
=275 days
Hence,the time for 99% primary consolidation for clay is 275 days
Calculation of the time 99% primary consolidation
t99-clay =
for the peat layer assume a single drainage
Substitute 200cm for Hdr. 1.781 for T99. And 0.025 cm2/sec for Cv.
t99-peat=
2,849,600s*
=33 days
Hence,the time for 99% primary consolidation for clay is 33 days
Secondary compression in clay
Sc-clay = C’a*Hlog[t2/t1]
C’a secondary compression index , t1 = initial time, t2 = final time
primary = cC*log[
Cc = 0.36, 0 = 60.76 kN/m2,
primary =0.36*log[
= 0.36 *0.1407
= 0.0506
Computation of void ratio of clay
ep = e0 – primary
substitution e0 1.1, primary =0.0506
ep = 1.1 – 0.0506
= 1.049
Calculation of the primary compression index
C’a =
Ca = 003, ep = 1.049
C’a =
= 0.0146
Substitution of C’a = 0.0146, H = 4 m, t1 = 275 days , t2 = 365 day
Ss-clay = 0.0146 * 4*log[
= 0.0247
Computation of secondary compression in peat layer
Ss-peat = C’a*H*log[t2/t1]
C’a secondary compression index , t1 = initial time, t2 = final time
primary = cC*log[
Cc = 6.6, 0 = 83.33 kN/m2, , e0 = 5.9
primary =6.6*log[
= 6.6 *0.071
= 0.468
Computation of void ratio of clay
ep = e0 – primary
substitution e0 5.9, primary =0.468
ep = 5.9 – 0.468
= 5.432
Calculation of the primary compression index
C’a =
Ca = 0.263, ep = 5.432
C’a =
= 0.0408
Substitution of C’a = 0.0408, H = 2 m, t1 = 365 days , t2 = 33 day
Ss-clay = 0.0408 * 2*log[
= 0.109
d)
S = Sc + Sc-clay + Sc-peat
Sc = 0.232, Sc-clay = 0.0247 and Sc-peat = 0.109
S= 0.232 + 0.0247 + 0.109
= 0.365 m
Tv =
Time = t, Cv = coefficient of consolidation, Hdr = maximum drainage path
t = 3 months , Cv = 0.003 cm2/sec, , Hdr = 200 cm
Tv =
= 0.5832
Hdr = 4/2 = 2 m , since the c lay layer is a double drainage
= 200 cm
Calculation of degree of consolidation
Calculate the ratio of = z/Hdr
Hdr = 2 m, z = 3 m
z/Hdr = 3/2 = 1.5
Variation of Uz with Tv and z/Hdr
Uz = 0.85
Computation of excess pore water pressure at point A
uz = (1 – Uz)u0
= (1 – 0.85)*23.25
= 0.15 * 23.25
= 3.4875 kN/m2
Calculate the increase in effective stress after 3 months
0 – uz
z = 3.4875 kN/m2 and u0 = 23.25 kN/m2
0 – uz
= 23.25 – 3.4875
= 19.76 kN/m2
Effective stress at point A on clay layer
0 = 2 *15 +2*17+3*18 – (2+3)9.81
Final effective stress after 3 month
0 = 0 +
0 = 68.95 kN/m2,
0 = 0 +
= 68.95 + 19.76
= 88.71 kN/m2
Q4)
Q = 200 kips
10 ft = 3
100 pcf = 15.72
120 pcf = 18.87
110 pcf = 17.3
Z = from footing to centre of clay layer
= 2 + 3 +2 = 7 m
= 484.44 N/m2
Settlement
Ss =
H = 3 m
Cc = 0.009(LL-10)
= 0.009(40 -10) = 0.27
e0 = 1.0
0 = [(15.72 *2) + (18.87*3)+(17.3*2)]-[9.81 * 4.5]
= 78.505 kN/m2
Ss =
=
= 2.164 *10-3 m
Q5)
Trial no. |
Weight of moist soil in N |
Moisture content (%) |
1 |
16.48 |
9.9 |
2 |
16.78 |
10.6 |
3 |
17.36 |
12.1 |
4 |
17.95 |
13.8 |
5 |
18.25 |
15.1 |
6 |
18.44 |
17.4 |
7 |
18.34 |
19.4 |
8 |
18.15 |
21.2 |
Moist unit weight
Substituting = 16.48 * 10-3 kN for W and 953.3 *10-6 m3
29 kN/m3
Determination of dry unit weight = d =
= 15.73 kN/m3
Table of moist unit weight and dry unit weight values
V in cm3 |
Weight of moist soil in N |
Moisture content (W) (%) |
d in kN/m3
|
|
953.3 |
16.48 |
17.29 |
9.9 |
15.73 |
953.3 |
16.78 |
17.60 |
10.6 |
15.91 |
953.3 |
17.36 |
18.21 |
12.1 |
16.24 |
953.3 |
17.95 |
18.83 |
13.8 |
16.55 |
953.3 |
18.25 |
19.14 |
15.1 |
16.63 |
953.3 |
18.44 |
19.34 |
17.4 |
16.47 |
953.3 |
18.34 |
19.24 |
19.4 |
16.11 |
953.3 |
18.15 |
19.04 |
21.2 |
15.71 |
From the graph
The maximum dry unit weight = 16.64 kN/m3
Optimum moisture content = 15.0%
The void ratio € using the dry unit weight
s is the specific gravity of soil
16.64 =
1 + e = 1.58
e = 0.58
finding the degree of saturation (S)
Substitute 15.0% for W, Gs = 2.68, e = 0.58
S = *100
= 69.31%
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download