Introduction:
A SIPOC (Supplier-Input-process-Output-Customer) diagram is used to identify all the important key elements of a process before the work begins. It is an easy way to define a project that may seem complex and is not well scoped. It is usually employed in the Measure phase of DMAIC process used in Six Sigma (iSixSigma, 2013). SIPOC outline is additionally used to kick-begin critical thinking inside the business procedure. Above all else, the graph is helpful if the group needs to concede to the normal language and comprehension of the procedure. It does proves to be a good tool for problem solving and mapping of a particular process (iSixSigma, 2013).
Get Help With Your Essay
If you need assistance with writing your essay, our professional essay writing service is here to help!
Essay Writing Service
The success of any project depends on the stakeholders or partners of the project. A stakeholder is a person who is a part of the process of the project in a direct or indirect way. The project outcome is a combined result of all the inputs, the various processes included till the desired product is completed and finally delivered to the customer. A SIPOC diagram thus give a brief overview and better understanding of a process involved in any project along with all the dependent parameters. In this process more emphasis is given to the improve quality and reduce downtime of the machine
Supplier
Input
Process
Output
Customer
Steel
Plant
Steel Sheets
Shop floor Processes:
Cutting
Folding
Tack Weld
Robo weld
Final Inspection
Leak testing
Thread tapping
Rework
Fuel Tank
Buggy buyer
Weld-it
Welding Rod
Buggy
Dealership
owner
AB works
Filler Cap
Worker wages
Service
Department
SNK Valves
Breather
Profit to company
NCV works
Fuel outlet port
Employer
Workers
Company
Machines
Input Metrics
Process Metrics
Output Metrics
1.Process responsiveness.
2.Process output.
3.Material storage and Quality
1. Rework percentage/shift.
2. Defects at each station.
3. process efficiency.
1.Process accuracy.
2.Pass rate/shift.
3.Overall finish.
Quality
1. Time to receive order.
2. Time to receive shipping info.
3. Time to order raw materials.
1. Number of process steps.
2. Time to complete tank.
3. Time delay between steps.
4. Time to deliver tanks.
5. Time for Rework.
1.Process Cycle time
2.Time/part
Time
1.Amount of raw material
required/day.
2.Electricity bill and overheads.
1. Number of process steps.
2. Wastage at each station.
3. Machine maintenance.
1. Cost per tank.
2. Cost of staff.
3. Cost of transportation.
4. Cost of package
Cost
Description:
The SIPOC diagram represents the processes required for the assembly a fuel tank. The tank has various subcomponents which are supplied by the suppliers. The key stakeholders on the process include the Steel plant that supplies the steel sheets of 2 and 3mm for tank and baffles respectively. Welding rods are supplied by Weld-it. The filler caps are custom made to suit the purpose and are supplied by AB works. SNK valves supplies non-return type of valves which are suitable for this application. NCV works being the supplier of fuel outlet port. The inputs for the process include steel sheets, Welding rods, filler caps, breather and fuel outlet port.
For good quality product the process efficiency is major aspect taken into consideration. Process efficiency depends on the pass rate and accuracy of production. The material used for tank making also taken into consideration. From storage to material handling. If the material is damaged it will affect the end result.
Material
Steel
Process
Sheet Metal fabrication
Thickness
2.00mm(tank)
1.00mm(Baffle)
Order Quantity
50 RHS , 50 LHS = 100/week
Process
Operation
Quantity
Time(sec)
Tank cutting
Laser cutting
6
110
Baffle cutting
Laser cutting
3
70
Folding
Manual folding
7
105
Baffle assembly
Manual welding
6
180
Tack weld
Manual welding
12
180
Robot Weld
Robot welding
5
69
Leak testing
Pressure check
1
150
Final Assembly
Manual tap and fit
1
405
Inspection
Visual
1
60
Rework
Manual/machine
1
300
TOTAL
43
1629 (secs)
27.15(mins)/tank
Process:
The shift begins with an order confirmation. The tank is made out of steel and hence it is laser cutting of the right and left tank with the baffle parts in the desired shape and dimension at the beginning of the process at the cutting station. The data for folds is fed in the laser machine. At the manual folding machine all folds from 1-6 are completed followed by the assembly of the baffle in the partially closed tank and welded in place before the final fold 7 is completed. The tank is then fixed and tack weld to fill the corners. Then filler cap is installed and tacked into position. Further the tank is tested for leaks by applying water pressure. If any leak is found it is then marked and sent back to the rework area. 3% of the tanks are sent back for rework. The passed tanks are then sent to the final assembly area where threads are cut onto the filler cap and on the tank where filler is fitted so the fuel cap fits on it perfectly. At the final inspection area the tanks is checked for any defects before being sent to the dispatch section. If there are any defects in the tank it is then sent to the rework station so that all defects are modified by grinding, welding and if needed reassembly.
Red line- Welding
Blue line- Fold
Black line-Outline
Conclusion:
The tanks are to be delivered at a rate of 50 buggy sets/week which is total of 100 tanks/week. Each tank takes about 27.15mins to complete. Each shift consist of 6.5hr for 5 days/week which is equivalent to 13 tanks/day and 65 tanks/week which is very less than the projected forecast. The manufacturer needs to reduce the changeover time and increase the shift time or keep two shifts to achieve the required target of 100 tanks.
References:
iSixSigma. (2013). SIPOC Diagram | iSixSigma. [online] Available at: https://www.isixsigma.com/tools-templates/sipoc-copis/sipoc-diagram/ [Accessed 30 Aug. 2019].
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download