The task is about a nursing home that wished to replace its existing Air Conditioning system on account of obsolesce and trying to explore more efficient and in trend technologies for its business purpose. In this regard, nursing home is exploring various options to implement the solution. The same has been discussed and analyzed in Test 1 and forms a part of this report and the excel sheet enclosed here in with and marked as Annexure-1& 2.
Define the scope (or boundary) of the assessment in your comparison (e.g., whether it includes any tax allowance and VAT)
The above analysis does not encompass any treatment for tax and is not included in the said assessment. Further, the VAT levied at the time of installation of air conditioners, service cost, maintenance cost and other ancillary cost has been ignored for the analysis. The analysis also does not include treatment for depreciation and other non -cash charges associated with running the operation of Nursing Home.
The assessment is limited to the data provided in the sample and includes some realistic assumption decoded from various sources. The sources of assumptions used forms a part of the report. Further, the purpose of the test has been limited to test some basis life cycle methodologies. The rate of inflation has been assumed @8% and the discounting factor for the purpose of analysis has been assumed at 10%. The computation also includes an assumption regarding the standard life of the asset i.e. 10 years and the maintenance contract shall get terminated on completion of the project without any additional expenditure. Even, if such expenditure is analysed and computed, the results and conclusion drawn shall not change as proposition 1 shall still remain most lucrative.
Further, repair cost of BHD 250 incurred over the past 4 years has not been considered for analysis as the same does not contribute significantly to decision making.
Choose a life cycle cost analysis technique (e.g. payback, net present value or net saving methods) and the corresponding decision making criterion (e.g. fastest payback, lowest net present value, or positive net saving)
The life cycle cost analysis includes the testing for the following:
The assumption includes:
Result of the analysis for 10 years when saving of electricity has not been considered
Sl No |
Particulars |
New Window Air Conditioners |
Split Air Conditioners |
Central Air Conditioning System |
1 |
Capacity |
216000 |
240000 |
– |
2 |
Total No of units |
20 |
17 |
|
3 |
Supply Cost |
2077 |
3726 |
5063 |
4 |
Installation cost |
600 |
646 |
0 |
5 |
Total Cost initially |
2677 |
4372 |
5063 |
6 |
Expected Life |
10 |
10 |
10 |
7 |
Service cost (Refer Note 1) |
1078.92 |
1260.99 |
2535.47 |
8 |
Replacement cost (Refer Note 2) |
1620.00 |
1428.00 |
625.00 |
9 |
Energy Consumption (Refer Note 3) |
1274.67 |
1429.82 |
129.55 |
10 |
Total Maintenance Cost (Refer Note 4) |
2698.92 |
2688.99. |
3160.47 |
11 |
Inflow (Refer Note 5) |
14486.56 |
14486.56 |
14486.56 |
12 |
Net Cash flow (Refer Note 6) |
10512.96 |
10367.75 |
11196.54 |
13 |
NPV ( Refer Note 7) |
3427.29 |
1737.84 |
1540.09 |
14 |
Payback Period (Refer Note 8) |
3.29 |
4.9 |
5.2 |
15 |
Discounted Payback Period (Refer Note 9) |
4.11 |
6.8 |
7.3 |
16 |
Profitability Index (Refer Note 10) |
2.28 |
1.40 |
1.30 |
Note 1 to 10 : Refer Excel
On the basis of the above analysis, it may be understood that the 1st option i,e, new window air conditioners has the highest ranking in all the metrics except total maintenance cost. Thus, first option should be the best method under the proposed options. The detailed analysis forms part of the excel sheet enclosed herewith and marked as Annexure-1.
The assumption includes:
Result of the analysis for 10 years when saving of electricity has been considered
Sl No |
Particulars |
New Window Air Conditioners |
Split Air Conditioners |
Central Air Conditioning System |
1 |
Capacity |
216000 |
240000 |
– |
2 |
Total No of units |
20 |
17 |
|
3 |
Supply Cost |
2077 |
3726 |
5063 |
4 |
Installation cost |
600 |
646 |
0 |
5 |
Total Cost initially |
2677 |
4372 |
5063 |
6 |
Expected Life |
10 |
10 |
10 |
7 |
Service cost (Refer Note 1) |
1078.92 |
1260.99 |
2535.47 |
8 |
Replacement cost (Refer Note 2) |
1620.00 |
1428.00 |
625.00 |
9 |
Energy Consumption saving (Refer Note 3) |
246.42 |
91.27 |
1334.91 |
10 |
Total Maintenance Cost (Refer Note 4) |
2698.92 |
2688.99 |
3160.47 |
11 |
Inflow (Refer Note 5) |
14486.56 |
14486.56 |
14486.56 |
12 |
Net Cash flow (Refer Note 6) |
12034.05 |
11888.83 |
12661.00 |
13 |
NPV ( Refer Note 7) |
4307.40 |
2617.96 |
2392.30 |
14 |
Payback Period (Refer Note 8) |
2.92 |
4.4 |
4.6 |
15 |
Discounted Payback Period (Refer Note 9) |
3.55 |
5.9 |
6.4 |
16 |
Profitability Index (Refer Note 10) |
2.61 |
1.60 |
1.47 |
Thus on the basis of the above it may be seen that even after considering the saving in electrical consumption from installation of new systems, option 1 i.e. new window air conditioners shall still be the best proposition as all the metrics discussed above are best in option 1 except maintenance cost which is best in option 2. The detailed working has been enclosed herewith and marked as Annexure-2.
Apart from the cost, system’s suitability in terms of the functionality of the building is vital. In addition to that, installation defaults will affect the Energy Efficiency Ratio (EER) while using. Explain what other considerations needed to be considered in choosing the option.
The other factors that needs to be analyzed includes:
Introduction
Construction cost is the total amount required to finish the work. The estimated amount is computed to finish the work. It is the ascertainment of the value of the project based on the available data. Cost estimate as defined by the Business Dictionary as “approximation of the probable coat of a product, program or project computed on the basis of the available information” and the estimation accuracy depends upon the information available. (Oyedele, 2015)
According to Business Dictionary (2013) four types of costs estimates that need to be considered in Construction work: (Oyedele, 2015)
Planning estimate: A layout or a rough calculation of cost within the range drawn for internal purpose only.
Budget estimate: It is based on information available and established plan layout.
Firm estimate: value based on analysis of cost data that is genuine enough to enter into any contract.
Not to exceed /not less than estimate: Taking into account the firms estimate the maximum and minimum required to achieve the task (Oyedele, 2015)
Big Differences in Costs
Two major costs are involved in construction of a new building. Hard costs and soft costs, Hard Costs include building material, supplies and equipment in building process and soft costs include engineering fees ,labor costs, architectural costs and other expenses. Increase in hard costs and soft costs will result in overall increase in construction costs. In metro cities, construction costs are usually higher as compared to other non-metro cities. (Nicco, 2017)
Costs Up For All Building Types
Building made with different quality of concrete from 2014 to 2016 costs vary from $3.3 million for 1 to 3 storey buildings and $33.7 million for 8 to 24 storey buildings. As we can see the construction is at the highest level for 8 to 24 storey buildings. (Nicco, 2017)
*Forecasted subject to change.
We can see from the above table that construction cost is at the highest level for 8 -24-storey building and lowest for 1 – 3 storey buildings. As seen from above construction cost for 8-24 storey buildings starts from $ 28.2 million in year 2013 and rises to $33.7 million in 2017 and the per square feet cost also escalated from $ 194.6 to $ 233.But in case of 1-3 storey building cost raised by $1.0 million from the year 2013 to year 2017 resulting in overall increase of 30 percent but the increase in 4 -7 storey is nominal up by $1.4 million an increment of 14 percent. (Nicco, 2017)
As the Company is planning to build building and has two option one for 3 storey building which contain two buildings each with 1200m square Gross Internal Area. In addition, the second for 2400m square Gross Internal Area for staff quarters, pharmacy, cafeteria and car park, the company should go with option one as the cost of construction of three-storey building with 1200m square each is low as can be seen from the above table. The total cost involved including hard and soft costs, in construction of three storey two buildings is approx $17.2 million and the construction of six storey building total cost involved is approx $23.0 million (as seen from the above table).So the nursing home should go with the construction of three storey building as the cost of construction is low compared to construction of six storey building. (Nicco, 2017)
Electricity tariffs . (n.d.). Retrieved july 5, 2018, from saudigazette.com: https://saudigazette.com.sa/article/524039/SAUDI-ARABIA/Electricity-tariffs-to-be-revised-from-Jan-1
Nicco, F. (2017). Multifamily Market Commentary – March 2017. Retrieved July 5, 2018, from https://www.fanniemae.com/resources/file/research/emma/pdf/MF_Market_Commentary_031517.pdf
Oyedele, O. A. (2015). Evaluation of Factors Affecting Construction Cost Estimation Methods in Nigeria. Retrieved July 5, 2018, from https://www.researchgate.net/publication/281620496_Evaluation_of_Factors_Affecting_Construction_Cost_Estimation_Methods_in_Niger
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download