1.Preliminaries
The following project bill of quantities has been done on behalf of our clients Mr and Mr Education. The project is to be located at 14 Hemmings Street in Penrith NSW. It entails design and construction of a low rise residential building as per various Australian building standards and codes. For a detailed illustration of the project, the attached plan and section drawings can be perused.
SUMMARY OF THE PROJECT BILL |
|
|
ITEM |
COST($) |
|
Excavation |
9080 |
|
Concreting |
45121 |
|
Metal worker |
32601 |
|
Carpenter |
9904 |
|
Roofer |
45850 |
|
Ceramic |
73864.2 |
|
Painter |
6197 |
|
Waterproofing |
5488 |
|
Provisional |
100235 |
|
Electrical |
15293 |
|
Plumbing works |
16131 |
|
TOTAL |
359764.2 |
Meanwhile, the following work and trade elements were considered in arriving at the final project cost:
Excavation is necessary for landscaping. It involves digging out and removing earthing materials and infilling some areas. It is also necessary so as to establish the correct footing system. The following are to be considered for costing:
COST PER HR ($) |
HOURS TO WORK |
TOTAL |
|||
Plant equipment |
Rock drills |
250 |
8 |
2000 |
|
Excavators |
350 |
8 |
2800 |
||
Trucks |
200 |
8 |
1600 |
||
Lifters |
150 |
8 |
1200 |
||
Labour |
Operators |
70 |
8 |
560 |
|
Foremen |
90 |
8 |
720 |
||
Others |
Casual |
25 |
8 |
200 |
|
TOTAL |
1135 |
56 |
9080 |
This will involve all concrete works for footings, walls and slabs. Additionally, masonry will also be considered in this case hence the following are the elements that are considered: (check the attached excel sheet for details)
Metal work entailed proper selection of metal materials for various building elements like the door frames, window frames, fence grills and others. The following is the breakdown of the materials and equipment that were used in this case(check the attached excel sheet for details):
The work involved establishing the appropriate wooden form work and part of roofing. The following were elements considered(check the attached excel sheet for details):
Selection of appropriate roofing materials that correctly integrates with the overall design of the building was necessary hence the following elements were considered in this case(check the attached excel sheet for details):
(check the attached excel sheet for details)
Floor tiles quantity is arrived at by considering the total floor area to be done:
The total floor area was calculated by considering the floor sizes from the building floor plans:
Floor element |
Size |
Area (mm2) |
|
Family |
5030 |
5885 |
29601550 |
Meals |
5190 |
3685 |
19125150 |
Study |
3300 |
3000 |
9900000 |
Dining |
3000 |
3950 |
11850000 |
Living |
4070 |
3950 |
16076500 |
Double garage |
5500 |
5500 |
30250000 |
Kitchen |
5760 |
2785 |
16041600 |
Laundry |
2090 |
2560 |
5350400 |
Bed 1 |
5270 |
4060 |
21396200 |
Bed2 |
3540 |
3490 |
12354600 |
Bed 3 |
3540 |
4160 |
14726400 |
Bed 4 |
3340 |
3290 |
10988600 |
Rumpus |
7260 |
4000 |
29040000 |
Balcony |
5520 |
1610 |
8887200 |
Ensuite |
3400 |
2400 |
8160000 |
WIR |
1800 |
2040 |
3672000 |
Bath |
3260 |
3290 |
10725400 |
TOTAL |
258145600 |
||
QUANTITY OF TILES |
2868 |
||
UNIT PRICE |
0.65 |
||
TILE COST |
1864.2 |
||
LABOR |
6 tilers |
50 PER HR |
72000 |
TOTAL |
73864.2 |
Painting is considered among the last finishing works in a building. It involved application of paints of different colour and layer thickness. The amount of paint was arrived at by considering the wall areas to be painted. Hence the following are the cost elements(check the attached excel sheet for details):
(Check the attached excel sheet for details)
(Check the attached excel sheet for details)
(Check the attached excel sheet for details)
2.a)
Tender letter
Allam Homes Property Limited ABN No. 987 654 321 10th March 2018 Mr and Mrs Education, 14 Hemmings Street, Penrith NSW 2135 Dear Mr and Mrs Education, RE: Construction of New Residential Dwelling. We hereby tender to build and complete the construction of the residential 14 Hemmings Street house brick, Penrith for Mr and Mrs Education, as per architectural and engineering plans and scope of work supplied: For the sum of: $359764.20 (Three hundred and fifty nine thousand, seven hundred and sixty four and twenty cents). Construction time: 28 weeks Included in the above price is: 1. No allowance for excavation in rock 2. No allowance for work to any unknown underground service 3. A provisional sum of $2000.00 to remove trees shown on the plan 4. A provisional sum of $83200.00 for the removal and disposal of any asbestos contaminated materials noted to be removed. 5. Monetary sums as nominated to the value of $10,000.00 6. Builder margin of 15% to all variations 7. Builder margin of 15% to all provisional sum adjustments 8. Hours of work between 7.00am and 5.00pm Monday to Friday This tender is valid for a period of 30 days after which we reserve the right to review our price and is subject to council approval and satisfactory negotiation. Yours faithfully, Builder’s signature Builder’s name Engineer XYZ |
b) Tender Form
TENDER FORM Mr & Mrs J. Education P.O. Box 789 Penrith NSW 2751 Project: Brick Veneer House 14 Hemmings Street Penrith NSW 2750 Builders Name: __Allams Homes Property Limited_________________________________ Address: ___________________________________ ___________________________________ _____Penrith NSW 2751______________________________ ___________________________________ We hereby submit the following tender to construct the proposed brick veneer house at 14 Hemmings Street, Penrith NSW 2750, as per the plans and specification prepared by OTEN – Building & Construction and ALLAM HOMES Pty Ltd. Contract Sum: $____359764.20____________________________ Amount in words: _____Three hundred and fifty nine thousand, seven hundred and sixty four and twenty cents_____________________________ Contract Time: _____28_____________________________ Weeks Signed: __________________________________ Capacity: __________________________________ Date: _______10th March 2018___________________________ |
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download