The Sewing Easy Ltd allocates the indirect cost using traditional method basis on machine hours. For this, firstly the predetermined overhead rate needs to be computed for allocation of indirect costs to the product. The formula for calculating the predetermined overhead rate is as below:
Predetermined Overhead Rate = Total Indirect Overhead/ Total Machine hours
Hence, the predetermined overhead rate of the company is $31.25 (250,000/ 8000).
Now, the next step is to allocate the indirect overheads to products using above calculated predetermined overhead rate.
Particulars |
Basic |
Advance |
Total machine hours |
4,600 |
3,400 |
Units produced and sold |
1,600 |
1,500 |
Machine hour per unit (total machine hours/ unit produced and sold) |
2.88 |
2.27 |
Overhead per unit |
89.84 |
70.83 |
Hence, the cost per unit of the models is as below:
Particulars |
Basic |
Advance |
Direct material cost |
325.00 |
560.00 |
Direct Labor cost |
150.00 |
260.00 |
Allocated indirect overheads |
89.84 |
70.83 |
Other costs* (201,700/1,500) |
134.47 |
|
Total cost per unit |
564.84 |
1,025.30 |
*Other costs includes the following costs directly attributable to Advance Model.
Selling & Admin expense |
140,600 |
Interest expense |
25,200 |
Office rent |
35,900 |
Total expense |
201,700 |
Hence, the cost per unit for Basic Model is $564.84 and for Advance Model is $1,025.30.
Solution-2
Calculation of cost per unit under the current activity based costing system
ABC or activity based costing system is the system for allocation of costs to the product on the basis of activities or resources consumed by the respective product. It is a more practical method and generally provides the accurate results. For allocation of costs under this system, first of all, the cost drivers are identified and then the costs are allocated on the basis of cost drivers consumed by respective products.
The calculation of allocation of indirect costs to product as per ABC is as below:
Particulars |
Indirect Overheads |
Activities Consumed |
|
|
Cost allocation |
|||
Basic Model |
Advance Model |
Total |
Cost Driver |
Cost per activity |
Basic Model |
Advance Model |
||
Inspection |
20,000 |
200 |
750 |
950 |
Inspections |
21.05 |
4,211 |
15,789 |
Assembly |
90,000 |
4,600 |
3,400 |
8,000 |
machine hours |
11.25 |
51,750 |
38,250 |
Production scheduling |
105,000 |
50 |
500 |
550 |
Runs |
190.91 |
9,545 |
95,455 |
Machine set-up |
35,000 |
100 |
250 |
350 |
set up |
100.00 |
10,000 |
25,000 |
Total Costs |
250,000 |
75,506 |
174,494 |
|||||
No. of units |
1,600 |
1,500 |
||||||
Cost per unit |
|
|
|
|
|
|
47.19 |
116.33 |
Hence, the cost per unit of both the products is as below:
Particulars |
Basic |
Advance |
Direct material cost |
325.00 |
560.00 |
Direct Labor cost |
150.00 |
260.00 |
Allocated indirect overheads |
47.19 |
116.33 |
Other costs* (201,700/1,500) |
134.47 |
|
Total cost per unit |
522.19 |
1,070.80 |
Hence, the cost per unit for Basic Model is $522.19 and for Advance Model is $1,070.80.
Solution-3 (a)
December 2017 Profit and Loss Statement for the advance model using traditional costing
Particulars |
Units |
Per unit |
Amount ($) |
Sales * |
1,500 |
1,230 |
1,845,000 |
Expenses |
|||
Direct material cost |
1,500 |
560 |
840,000 |
Direct Labor cost |
1,500 |
260 |
390,000 |
Overhead cost |
1,500 |
70.83 |
106,245 |
Other expenses – Selling & Admin expense |
140,600 |
||
– Interest expense |
25,200 |
||
– Office rent |
35,900 |
||
Net Profit |
|
|
307,055 |
* The selling price per unit is 20% plus cost. Hence, the selling price per unit is $1,230 (1025.30*120%).
Solution-3 (b)
December 2017 Profit and Loss Statement for the advance model using ABC
Particulars |
Units |
Per unit |
Amount ($) |
Sales * |
1,500 |
1,285 |
1,927,433 |
Expenses |
|||
Direct material cost |
1,500 |
560 |
840,000 |
Direct Labor cost |
1,500 |
260 |
390,000 |
Overhead cost |
1,500 |
116.33 |
174,494 |
Other expenses – Selling & Admin expense |
140,600 |
||
– Interest expense |
25,200 |
||
– Office rent |
35,900 |
||
Net Profit |
|
|
321,239 |
* The selling price per unit is 20% plus cost. Hence, the selling price per unit is $1,285 (1070.80*120%).
Analysis of Overseas buyer behavior of purchasing advance model only
The traditional method allocates the overhead on the basis of common allocation resource be it labor hours or machine hours. This method does not take into account the actual usage of that common resource by the products. Hence, it allocates the cost on the basis of blanket rate and usually does not provides the accurate results.
On the other hand, the activity based costing allocates the overhead on the basis of actual resources consumed by the products and hence generally provides the accurate results.
Let’s compare the cost of the two products under above two defined methods.
The cost of the two products under traditional costing is $565 for Basic Model and $1,025 for Advance Model whereas the cost of the products under activity based costing is $522 for Basic Model and $ 1,071 for Advance Model. Hence, it can be seen that the Basic Model is overpriced by $43 ($565-$522) and the Advance Model is underpriced by $45 ($1025-$1071).
Since, the Advance model is underpriced than its actual price and might be possible that the Advance product is not available in the market at this price, since it is underpriced. That’s why the overseas buyer is interested in buying the advance product as it is underpriced and further, they are not interested in buying the basic product as it is overpriced.
Solution-4
The actual overheads refers to the amount of indirect overheads actually incurred by the business. The indirect overheads are those overheads which cannot be directly allocated to the products. Like factory rent, electricity of factory, supervisor’s salary, etc.
On the other hand, the applied overheads are those overheads which have been applied to the products using predetermined overhead rate which is calculated by dividing the estimated indirect overheads with estimated machine hours or labor hours. These applied overheads usually differs from actual overheads as the overheads used for the calculation of applied overheads are estimated and when the overheads are incurred in actual then they differs from estimated one.
However, rarely it happens that the applied overheads and the actual overheads are the same. This is when the estimates becomes actuals. That is, the estimated overheads are same as actual overheads and the estimated machine or labor hours are the same as actual machine or labor hours.
The three ways to deal with over or under applied overheads are:
Solution-5
The ABC is a very popular method and has the following advantages: (Money Matters | All Management Articles, 2018)
Apart from the advantages, ABC has some disadvantages as well. Some of the disadvantages of ABC method are: (Your Article Library, 2018)
References:
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download