According to the laboratory facilities requirement that GovMed, the Government Research Organization has right now, there are two delivery contract models that can be put into use for the construction of the laboratories they need. These can be listed with their contract models as below:
Design-Bid-Build: The delivery contact model of design with belt are commonly termed as the conventional method or heartbeat is a process in which the owner, which in this case is GovMed, contracts with the different entities for acquiring the actual design and the construction that is required for the project which is the designing and developing of the Laboratories. In this process there are three phases applied to the entire construction delivery contract(Nicholas and Steyn 2017). These are the design phase, the tendering phase, and the construction phase. In the design phase GovMed would like to retain the architect who is skilled in Consulting for the Engineering infrastructural Works to design and producer documents for bidding. This bidding documents would also include the drawings and technical specifications for the Constructions which can be referred by different general constructors for the progression of the project. The next phase is the bid or tender phase, in which anybody who is qualified me participate and select the general contractors bidding. Once these bids are received, the main architect reviews them and clarifies any inconsistencies that define from the end of the bidders. Further the architect indulges in ensuring that all the documents and order and investigate the qualifications of the contractor. If any inconsistencies are found the key architect in abandon the project completely(Maharjan and Shrestha 2017). The final phase of this delivery contract is the construction of the project that the contractor gets after having approval of the construction drawing and all the technical specification which are not allowed to be altered. The architect also accesses the Agent of the owner while the construction phase is going on to evaluation if the progress of the word recounts to the request from the outworker that has been presented to him or her. If any issue is found in the construction process that may seem to be not synchronizing with initial documents, the project can be halted.
CM Multi Prime: There are several project delivery methods within the field of construction management that happened to deal with contractual obligations. Although a construction manager or a CM of multiple Prime is similar to a construction manager at risk both of them are very separate project delivery systems(Kristensenet al. 2015). The multi Prime CM is adopted by the owners of construction that are not staffed with too much work force to support and manage the construction work all by themselves and has to hire an agency CM for performing all the management of construction work for the form(Carpenter and Bausman 2016). However it is find that probably most of the organizations that use this project delivery method are mostly the public sectors. Therefore in this case where GovMed is a public government organization it is a probable choice for the construction work to follow this delivery method. This project delivery method ensure the providers are the owner of the organization are assured with the flexibility to select any contractor that suits several factors of the construction project rather than only depending on the price. Videos of this agency CM during the design development and the transition from design to construction this project delivery method appears more seamless which is why it becomes much more appropriate.
Design-Bid-Build:The advantages of this Project Delivery Method can be as listed as follows:
The disadvantages of this Project Delivery Method can be as listed as follows:
CM Multi Prime:The advantages of this Project Delivery Method can be as listed as follows:
The disadvantages of this Project Delivery Method can be as listed as follows:
Therefore, analyzing both the Project Delivery Methods, it can be concluded that the CM Multi Prime is a better option between the two, since it has better options of maintaining quality at lower prices which is pretty underrated process of the former project delivery method.
The clauses that should be tightened to ensure the requirements for project cost, timeline and delivery performance for GovMeds laboratories are as listed as below:
Risk |
Effect of Risk |
Level of Risk |
Mitigation in Contract |
Lack of acceptance of investors of the design for the GovMed Laboratory |
Increased cost due to suspension of work |
Low |
Market observation, alternative design solution |
Delays and difficulties in having opinions and permits |
Distributed designing process |
Medium |
Earlier diagnosis of the situation |
Conflict amongst designing team members |
Distributed designing process |
Low |
Team leader to mediate in all sorts of conflicts |
Too optimistic assessment of employee workload |
Delay in designing process |
Low |
Proposing employees to work overtime or ordering part of work to another design team |
Incorrect information from investor or lack of clear guidelines |
Verifications of errors increases cost and time due to design revision |
High |
Application to investor for extension of time to complete designing |
Staff having less knowledge about designing a laboratory |
Verifications of errors increases cost and time due to design revision |
Medium |
Designing team leader strengthens control over work with providing the employees consultation with and expert |
Acceptance of unrealistic deadlines in contract |
Deterioration of design quality and failure of deadline |
High |
Employment of new employees or ordering part of work to another party during a contract |
Understanding of design budget |
Deterioration of design quality |
High |
Limiting scope of design to necessary minimum |
Table 1: Risk Register and Risk Mitigation
(Source: Created by Author)
A contracting approach should start with planning the entire project of construction. But before proceeding math anything else it is needed to be kept in mind that all the work that has to be done in the project should be there in the contract(Scott and Dunne 2018). In addition to that the plan for any extra purchase and acquisitions also be mentioned in the contracting approach. It is necessary to put focus on the managing of the contract the metrics that will be needed to make in order to be successful picking up of a seller and administration of the contract while the work is in progress.
The procurement, the scheduling and the management however follows a logical order. The schedule plan details on the procurement process in which it will be managed (Meloet al. 2016). For GovMed laboratory construction the project procurement schedule is to be listed as below:
References:
Carpenter, N. and Bausman, D.C., 2016. Project delivery method performance for public school construction: Design-bid-build versus CM at risk. Journal of Construction Engineering and Management, 142(10), p.05016009.
Chen, Q., Jin, Z., Xia, B., Wu, P. and Skitmore, M., 2015. Time and cost performance of design–build projects. Journal of Construction Engineering and Management, 142(2), p.04015074.
deMelo, R.S.S., Do, D., Tillmann, P., Ballard, G. and Granja, A.D., 2016. Target value design in the public sector: evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp.125-137.
Kristensen, K., Lædre, O., Svalestuen, F. and Lohne, J., 2015. Contract models and compensation formats in the design process. In Proc. 23rd Ann. Conf. of the Int’l. Group for Lean Construction. Perth, Australia, July (pp. 29-31).
Maharjan, R. and Shrestha, P.P., 2017, December. Relationship between Project Performance and Contract Procurement Factors for Design-Bid-Build Texas Highway Projects. In Construction Research Congress 2018 (pp. 150-160).
Naoum, S. and Egbu, C., 2015. Critical review of procurement method research in construction journals. Procedia Economics and Finance, 21, pp.6-13.
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and technology. Routledge.
Nikou Goftar, V., El Asmar, M. and Bingham, E., 2014. A meta-analysis of literature comparing project performance between design-build (DB) and design-bid-build (DBB) delivery systems. In Construction Research Congress 2014: Construction in a Global Network (pp. 1389-1398).
Ogunsanmi, O.E., 2016. Risk classification model for design and build projects. Covenant Journal of Research in the Built Environment, 3(1).
Reynolds, C., Stair, M., Miller, B. and Stryzinski, T., 2018. Design Bid Build vs. Design Build Best Value.
Sanz, M.A., Franz, B., Molenaar, K., Esmaeili, B. and Pellicer, E., 2017. Anexplorationof team integration in design-bid-build projects. In 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, ISEC 2017. ISEC Press.
Scott, L. and Dunne, J.E., 2018. Analyzing the Restoration of the Oklahoma State Capitol from the Perspective of the Design Build Process: a Descriptive Case Study.
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download