Design of a Wastewater Treatment Plant
DESIGN OF SECONDARY BIOLOGICAL TREATMENT PLANT
Abstract
TO PROVIDE A DESIGN APPRAISAL FOR INCLUSION OF A SECONDARY TREATMENT PLANT THAT IS CURRENTLY EQUIPED WIH A PRIMARY TREATMENT PLANT
TABLE OF CONTENTS
1. INTRODUCTION
2.INTRODUCTION TO BIOLOGICAL NUTRIENT REMOVAL (BNR)
3. DESIGN DATA & PARAMETERS ASSUMED
3.1 DESIGN FLOW Q
3.2 PROCESSING TEMPERATURE
3.3 INFLUENT TKN
3.4 READILY BIODEGRADABLE CHEMICAL OXYGEN DEMAND
4. DESIGN PROCEDURE
5. BIOWIN MODELLING
6. CONCLUSION
7. REFFERENCES
APPENDEX
Wastewater Treatment Plant Design
1.INTRODUCTION
The Coastal Wastewater treatment plant currently has a Primary Treatment Plant only. A design appraisal has been requested for a secondary treatment plant. This report is to design a draft based on the influent characteristics of the waste water and designed for the give effluent characteristics.
The accumulation of nutrients in the waste water especially nitrogen and phosphorous leads to decrease in water quality. To control and treat the waste water various treatment methods have been tested. After careful consideration of various influent parameters like BOD, COD, Ammonia-N, TSS, Total Nitrogen and Total Phosphorous etc., the “Anerobic-anoxic-aerobic (A2O)” process was employed due to its ease of working and diverse advantages.
2.Intoduction to Biological Nutrient Removal Process (BNR)
Biological Nutrient Removal Process was developed in the 1960s, it has been used since then due to is various advantages over other Chemical Process. BNR is a modification of Activated Sludge Treatment Process that incorporates an Anoxic and/or anerobic zones to enables removal of nitrogen and phosphorous from the wastewater.
“Anerobic-anoxic-aerobic” is a type of BNR which has a 3 stage Phoredox Anerobic-Anoxic-Oxic (A2O) system. The stages in this system are Anerobic system, anoxic system, and aerobic system. Each system treats a certain type of effluent. The treatment of phosphorous takes place in the anerobic stage whereas BOD gets treated in the aerobic stage by the process of nitrification. Denitrification process removes the nitrate in the anoxic stage. (Metcalf & Eddy, 2003). Any process has certain limitation, so does A2O process. Some of the limitations of the process are, i) decrease in the reduction of the removal of the Phosphorous due to recycling of RAS along with nitrate in the anerobic stage. ii) decrease in removal of Nitrogen due to internal recycling ratio (Metcalf & Eddy, 2003). iii) reduction in activity of PAOs.
Fig shows the proposed A2O process secondary treatment plant
3. Design data and Parameters assumed.
The designing of the Secondary wastewater Treatment Plant is based on the provided design data, Kinetic data and few important assumptions made. Some of the Kinetic data is incorrect so corrections had to be made to bring them in the recommended range as given in the Metcalf & Eddy, (2003).
3.1 Design Flow Q
To obtain the daily flow rate ‘Q’ for the give proposed capacity of 210,000 Equivalent Population (EP), an average daily consumption of 340 L/ep (Riverina Water County Council, NSW) was taken for calculation along with an 80% recovery factor. A peaking factor of 1.93 was taken (Harmon Coefficient). So, the flow rate, Q= 340 x .8 x 1.93 x 210,000 = 110,241.6 m3/day.
3.2 Processing Temperature
Average processing temperature of 200 was set for easy calculation therefore there was no need for corrections for Kinetic coefficients.
3.3 Influent TKN
The TKN value is taken in the form of NH4-N
3.3 Readily Biodegradable Chemical Oxygen Demand (rbCOD)
A major design parameter rbCOD was not given, therefore the value of rbCOD is assumed from Metcalf & Eddy, 2003. 15% – 25% of bCOD was taken at the end. To consider for the rbCOD consumed in anerobic stage, 25% was assigned for removal of Phosphorous removal and 10% was assigned for denitrification.
Table containing the design data and the assumed parameters
INFLUENT PARAMETERS
EFFLUENT PARAMETERS
Parameter
Unit
Value
Parameter
Unit
Value
Alkalinity
mg as CaCO3/L
269
BOD
mg/L
21
COD
mg/L
201
TSS
mg/L
4
pH
–
7.78
Ammonia-N
mg/L
1
TSS
mg/L
98
Total N
mg/L
27
VSS
mg/L
80
Total P
mg/L
6
Ammonia-N
mg/L
34.7
Total N
mg/L
48.2
Total P
mg/L
7.63
PARAMETER
UNITS
VALUE
REMARKS
Kinetic Data
Y
g MLVSS/g BOD removed
0.60
Given data
K1
kg BOD utilized/kg VSS.day
10
Given data
Kd
day-1
0.1
Given data
Ks
mgBODµ/L
20
Given data
Kinetic Constant for Nitrifying Bacteria
µNmax
d-1 at 20°C
0.7
Given data
KN
mg NH4 + as N /L
0.7
Given data
YN
Kg VSS/ Kg NH4+ as N nitrified
0.12
Given data
Assumptions
MLSS
mg/L
2400
Given data
Water consumption/per capita
L/ep. Day
340
(Riverina Water County Council, NSW)
Recovery factor
Percentage
80
Peaking factor (Harmon coefficient)
1.93
rbCOD/bCOD
—
0.25
(Metcalf & Eddy)
rbCOD/bCOD
—
1.6
(Metcalf & Eddy)
FS (TKN peak /TKN average)
—
1.5
(Metcalf & Eddy)
DO
mg/L
2
(Metcalf & Eddy)
BOD/COD Ratio
0.5
Average process temperature
0C
20
Ko
g/m3
0.5
(Metcalf & Eddy)
Kdn
g VSS/g VSS.d
0.08
(Metcalf & Eddy)
Fd
—
0.15
(Metcalf & Eddy)
Nox/TKN
—
0.78
(Metcalf & Eddy)
VSS/TSS
—
0.8
(Metcalf & Eddy)
Px,bio = Px,vss
rbCOD/NO3-N
g/g
6.6
(Metcalf & Eddy)
rbCOD/P
g/g
8
(Metcalf & Eddy)
Detention time in the anoxic tank
H
1
(Metcalf & Eddy)
4. Design Procedure
The various design data was changed to need for calculation purpose. Some of the kinetic constants were assumed. The assumed constants and other design data are mentioned in the above Table. Some of the missing data were also assumed for calculations. All these data and constants were obtained for “Metcalf & Eddy,2003”.
The design process was carried out in 3 stages. The first stage was the design for BOD and Nitrification. The second stage was for removal of Phosphorous. The third stage was designed for Denitrification process. An Activated Sludge process, single sludge bio-N removal process and an Anoxic/Aerobic process design was considered. (Metcalf & Eddy,2003).
BOD & Nitrification
The BOD and Nitrification removal process by Activated Sludge process was carried out by the following steps.
1. The DO concentration was assumed to 2 mg/L to calculate growth rate aimed at Nitrification µn by means of Eq.1. The nitrification factor of 1.5 was taken. Design SRT was computed using Eq.3 (Metcalf & Eddy,2003).
2. Using the Eq.4 the max Specific growth rate µm was calculated. Based on the Kinetic constants Y & K1, the effluent substrate (S) was calculated by means of Eq.5
3. Px,bio (Biomass Production) was calculated by means of Eq.9 grounded on the ideals of A, B and C using Eqs. 6, 7, 8. The NOx was assumed to be approximately equal to 0.8 TKN (Metcalf & Eddy,2003). But the real value was calculated using the Eq. 10. The obtained value was found to be similar to that of the assumed value.
4. The mass of VSS and TSS was calculated using Eqs. 12 and 13. The concentration of VSS was taken to be same as Px,bio as there was no info about the nbVSS. The concentration of TSS was calculated using Eq.11 presuming that VSS = 80% TSS (Metcalf & Eddy,2003).
5. The volume of the aeration tank was figured by Eq.14 for the given MLSS. Four number of basins were assumed with a depth of 6.5m and a width ratio of 1.5 : 1(Metcalf & Eddy,2003).
Phosphorous Removal
The removal of Phosphorous takes place in the anerobic stage in the A2O Process. The following are the procedures of the removal:
1. The determination of the rbCOD available for the removal of Phosphorous, Eq.25 was used. The nitrate mass balance was performed at the influent using Eq.22 bearing in mind no NO3 concentration in the influent. Taking rbCOD/nitrate = 6.6, bCOD/BOD= 1.6 and rbCOD/bCOD = 0.25 equivalent rbCOD was computed (Metcalf & Eddy,2003).
2. The P removed by Biological Phosphorous Removal was computed by Eq.26 taking 8g of rbCOD/g Phosphorous is removed BPR (Metcalf & Eddy,2003).
3. The concentration of Phosphorous removed was calculated by Eq.29 taking that the concentration of Bio P removed and the concentration of P used for biomass growth.
Denitrification
The anoxic stage is responsible for the denitrification. A recycle stream from aerobic zone with oxygen form nitrification being removed is considered. The design process carried out is as follows;
1. The biomass concentration was calculated by Eq.32, the volume of nitrite nursed into the anoxic tank is computed by Eq.33, Eq.34 and Eq.35. The volume of anoxic zone is computed by Eq.36 for a suitable detention time.
2. The amount of nitrate reduced was calculated by Eq.38. when the nitrate fed is not equal to the nitrate reduced, detention times must be varied. Specific Denitrification Rate as a function of MLSS with observed were computed, the SDNR was got using Eq.39.
3. The oxygen credit and the net oxygen needed was calculated using Eq.40 and Eq.41. The air flow rate was computed using Eq.42 and Eq.43. The equation 43 was used to convert mass flow rate to volumetric flow rate.
4. The required alkalinity was as conc of CaCO3 was computed by Eq.46 and Eq.47. It is an important factor as some of the reactions have the propensity to change the pH which impacts the system performance.
Design of Secondary Clarifier
Secondary clarifier was needed to settle and remove the suspended solids that include the nutrients. The design is a 3-step process, defining the return sludge recycle ratio, determine the clarifier size and loading volume of solid. The area of clarifier was determined using Eq.54 as a purpose of design flowrate and supposed hydraulic application rate. The diameter of the basin was designed based on the number clarifiers. The loading volume of solids was computed based on the Eq.58. The number of clarifiers varies based on the loading rate of solids.
5.BioWin Modeling:
BioWin is simulator used in designing of a wastewater treatment process, that bonds together the biological, chemical and the process models. BioWin is used all over the world to design, advancement and enhance wastewater treatment plants of all types. The core of BioWin is an exclusive biological model which is accompanied with other process models (e.g. water chemistry models for calculation of pH, mass transfer models for oxygen modelling and other gas-liquid interactions).
Get Help With Your Essay
If you need assistance with writing your essay, our professional essay writing service is here to help!
Essay Writing Service
The Biowin modeling was used to validate the theoretical values obtained. It was found that the theoretical values satisfied curtained parameters but did not satisfy other parameter. The model was edited to obtain the required effluent parameters. Parameter like Ammonia and COD obtained by the theoretical calculations were not in the required effluent range. Hence the model was reconfigured, like the theoretical volume of the aeration tank was very less and thus Ammonia couldn’t be reduced to the required effluent range. Therefore, the volume of the Aeration tank was increased by trial and error method to achieve the effluent standards.
The kinetic constants were entered. Mixers were used to mix the influent before it was inlet into the aeration tank. Splitters with a constant of 0.6 were used to recycle the RAS back to the Aeration tank from the Clarifiers. The treated biowaste was collected as sludge and was disposed. All the given Influent parameters were reduced successfully in the Biowin model.
Changes made in the design for attaining the given range was very sensitive. Change in dimensions in the Aeration tank or the clarifiers had subtle changes in the output.
6.Conclusion
To achieve the given effluent values for the influent values an Anerobic-Anoxic-Aerobic process was adopted for the design purpose. The 3-stage process consisted of BOD removal, Nitrification, Phosphorous removal & Denitrification in addition to design of clarifiers for settling and removal of biological suspended solids. Due to insufficient data given for designing several kinetic data and certain values were assumed as per requirement.(Metcalf & Eddy 2003). A few changes were made to the obtained values from the theoretical calculations to achieve the required effluent parameters.
The anticipated effluent values were achieved based on the proposed design. The Treatment plant can be implemented based on the proposed design and will have a high success rate in removal of the influent parameters.
APPENDEX-A
ASSUMPTIONS
PARAMETERS
UNIT
VALUE
REMARKS
Depth of basin
m
6.5
(Metcalf & Eddy)
Width to depth ratio
1.5 : 1
(Metcalf & Eddy)
CS,20
mg/L
9.08
(Metcalf & Eddy)
Α
—
0.65
(Metcalf & Eddy)
Β
—
0.95
(Metcalf & Eddy)
F
—
0.9
(Metcalf & Eddy)
CS,TH=CS,TH=CS,20
(Metcalf & Eddy)
Fine bubble ceramic diffusers with an aeration clean water O2 transfer efficiency
—
35%
(Metcalf & Eddy)
Required alkalinity to transform ammonium to nitrate
g CaCO3/g NH4-N
7.14
Residual alkalinity concentration to maintain pH in range 6.8-7
g/m3
80
(Metcalf & Eddy)
Influent alkalinity
g/m3 as CaCO3
140
(Metcalf & Eddy)
Return sludge mass concentration
g/m3
8
Design MLSS XTSS concentration
g/m3
3
Hydraulic application rate
m3/m2.d
22
(Metcalf & Eddy)
Number of clarifiers
3
Phosphorus content of heterotrophic
g P/g
0.015
(Metcalf & Eddy)
Alkalinity as CaCO3 produced per NO3-N Oxidized
g/g
3.57
(Metcalf & Eddy)
APPENDEX-B
SUMMARAY OF RESULTS
PARAMETERS
UNIT
VALUE
REMARKS
BOD REMOVAL AND NITRIFICATION
Average wastewater flow
m3/d
110,241.6
1ep =340 L/day
Average BOD load
kg/d
100.5
Average TKN load
kg/d
18
Aerobic SRT
d
3.198
>7, (Metcalf & Eddy)
Aeration tanks
4
4 tanks (Metcalf & Eddy)
Aeration tank volume, each
m3
4600
Aeration Tank Length
M
31
approx. 150m per tank, (Metcalf &eddy)
Aeration Tank Width
M
15
W:D ratio 1.5, (Metcalf & Eddy)
Aeration Tank Depth
m
10
Assumed
Hydraulic retention time
h
6.5
MLSS
g/m3
2400
MLVSS
g/m3
1582.642
F/M
g/g.d
0.593
0.04-1, (Metcalf & Eddy)
BOD loading
kg BOD/m3.d
0.939
0.04-1, (Metcalf & Eddy)
Observed yield
kg TSS/kg bCOD
0.810
kg VSS/kg BOD
1.296
Oxygen required
kg/h
1393.62
Air flowrate at average wastewater flow
m3/min
396.50
RAS ratio
—
0.6
Clarifier hydraulic application rate
m3/m2.d
22
16-24, (Metcalf & Eddy Table 8.7)
Clarifiers
Nos
3
Diameter ,m
46
Alkalinity addition as Na(HCO3)
kg/d
27410.47
BIOLOGICAL PHOSPHOROUS REMOVAL
P used for biomass growth
g/m3
1.22
P removed
mg/L
5.7387
P content of waste sludge
%
7.146
DENITRIFICATION
Effluent NO3-N
g/m3
6
Internal recycle ratio
6.266
RAS recycle ratio
0.6
Anoxic volume
m3
6429.98
Overall SDNR
g NO3-N/g MLSS.d
0.140
Detention time
h
1.2
Alkalinity required
kg/d as CaCO3
16316.08
EFFLUENT QUALITY PARAMETERS
Effluent BOD
mg/L
19.02
Target value achieved
Effluent NH4-N
mg/L
0.17
Target value achieved
Effluent N
mg/L
15.37
Target value achieved
Effluent P
mg/L
3.92
Target value achieved
Effluent TSS
mg/L
0
Target value achieved
APPENDEX – C
NOMENCLATURE
Q: influent wastewater flowrate (m3/d)
Ko: oxygen inhibition coefficient, g/m3
µm: Maximum specific growth rate (d)
BOD: Biological oxygen demand (mg/L)
DO: Dissolved oxygen, mg/L
Fd: cell debris fraction (unitless)
TSS: Total suspended solids (mg/L)
µNmax: Maximum specific growth rate of nitrifying bacteria, g new cells/g cells . d
MLSS: mixed-liquor suspended solids, mg/L
TKN: influent TKN concentration (mg/L)
µm: Maximum specific growth rate, (d)
PX,bio: Biomass production (kg VSS/d)
Ne: effluent NH4-N concentration, mg/L
µn: Specific growth rate for nitrification (d-1)
PX,VSS: Solid production as VSS (kg/d)
Total P: Total phosphorus (mg/L)
µ: Specific growth rate (d-1)
PX,TSS: Solid production as TSS (kg/d)
NH4-N: Ammonia as Nitrogen (mg/L)
SRT: Solid retention time (d)
Fraction VSS: fraction of VSS over TSS, unitless
Y: Heterotrophic yield coefficient (kg VSS produced/Kg BOD
FS: Safety Factor
XVSS * V: Mass of VSS (kg)
K1: Maximum specific substrate utilization rate (Kg BOD/Kg VSS.d)
So: Influent substrate concentration (mg/L)
XTSS * V: Mass of TSS (kg)
Kd: Microbial decay coefficient (d-1)
S: Effluent substrate concentration (mg/L)
V: Total volume of aeration tanks (m3)
Ks: Saturation coefficient (mg/L)
A: heterotrophic biomass, kg/day
Ƭ: Detention time (h)
YN: Nitrifier yield coefficient (Kg VSS produced/Kg NH4+ – N nitrified)
B: cell debris, kg/d
Lorg: Volumetric BOD (kg/m3.d)
Kdn: Endogenous decay coefficient for nitrifying organisms (g VSS/g VSS∙d)
C: nitrifying bacteria biomass, kg/day
Yobs,TSS: Observed yield base on TSS (g TSS/gBOD)
KN: Half-velocity constant, substrate concentration at one-half the maximum specific substrate utilization rate (g/m3)
D: Nonbiodegradable VSS in influent, kg/day
Yobs,VSS: Observed yield base on VSS (g VSS/gBOD)
rbCOD: Readily biodegradable chemical oxygen demand (mg/L)
TSSo: influent wastewater TSS concentration (mg/L)
NOx influent: Concentration of NH4-N in the influent flow that is nitrified (mg/L)
N: nitrogen concentration, g/m3
VSSo: influent wastewater VSS concentration (mg/L)
β: Salinity-surface tension correction factor (unitless)
Xb : active biomass concentration (mg/L)
F/Mb: BOD F/M ratio based on activated biomass concentration (gBOD/g biomass .d)
F: fouling factor (unitless)
kd: endogenous decay coeff. (1/day)
NOr: nitrate removed (g/d)
CS,T,H: Oxygen saturation concentration in clean water at temperature t and altitude h (mg/L)
NOx effluent: nitrogen oxides in the effluent (mg/L)
SDNR (MLSS): specific denitrification rate referred based on MLSS (g NO3-N/g MLVSS. d)
CS,20: Dissolved oxygen saturation concentration in clean water at 20C and 1 atm or 760 mmHg (mg/L)
IR : internal recycle ratio (unitless)
R1: Oxygen credit (kg/h)
CL : operating oxygen concentration
Qanoxic : flow rate to anoxic tank (m3 /d)
Ro: Net oxygen required (kg/h)
E: diffusers oxygen transfer efficiency
NOx feed: NO3– N fed to the anoxic tank (kg/d)
AOTR: actual oxygen transfer rate under field conditions(kg O2/h)
Alk produced-denitrification: alkalinity produced in denitrification (g/m3)
Vnox: volume anoxic tank (m3)
SOTR: Standard Oxygen Transfer Rate in Tap Water at20°C and zero dissolved oxygen (kg O2/h)
NOx RAS: nitrogen oxides in the effluent in the return activated sludge (mg/L)
SDNR: Specific denitrification rate (g NO3-N /g MLVSS.d)
α: Oxygen transfer correction factor for waste (unitless)
D: diameter (m)
Qr: RAS flowrate (m3/d)
R: return activated sludge (RAS) recycle ratio (unitless)
A: total area of clarifier (m2)
Xr: Return sludge mass concentration (g/m3)
X: Mixed-liquor suspended solids (mg/L)
APPENDEX – D
FORMUAL USED
EQUATION
NO
FORMULA
EQUATION
NO
FORMULA
BOD REMOVAL AND NITRIFICATION
1
=2.132 * 1.5
=3.198 d
Max Specific Growth rate
µm = K1 * Y
=10 *0.6 = 6
Effluent Substrate Conc (BOD Effluent)
S=Ks1+kd.SRTSRTμm–kd–1
S=201+0.1*3.1983.1986–0.1–1
S=1.47726 mg/L
Biomass Production
A (heterotopic Biomass)
A=QY(So–S(1kg103g)1+(kd)SRT
=11024106*0.6(100.5–1.47721+0.13.198
=4962.760 Kg/d
B (Cell Debris)
B=fdkdQYSO–SSRT(1kg103g)1+(kd)SRT
B=0.150.1110241.6*06100.15–1.47723.1981+0.1198
=396.772 Kg/d
C (Nitrifying Bacteria Biomass)
C=QYNOx1kg103g1+kdnSRT
C=110241.6*0.12(47.1994)1+0.13.198
=477.10325 Kg/d
PX,bio=A+B+C
PX,bio=4962.760+396.772+477.10325
=5836.6352 Kg VSS/d
Oxidation of Ammonia to Nitrate
NOx=TKN–Ne–0.12∙PX,bio/Q
NOx=48.2–1–0.12∙5836.6352/110241.6
=47.1994 g/m3
Concentration of VSS and TSS
PX,TSS=A0.85+B0.85+C0.85+D+Q∙(TSSo–VSSo)
PX,TSS=4962.7600.85+396.7720.85+477.18320.85+0+110241.6∙(98–80/1000)
=8850.97 Kg/d
Mass of VSS and TSS
XVSS∙V=(PX,VSS)∙SRT
XVSS∙V=(5836.6352)∙3.198
=18665.55 Kg
XTSS∙V=PX,TSS∙SRT
XTSS∙V=(8850.97)∙3.198
=28305.402 Kg
Design of Aeration Tank
V=XVSS∙VMLSS
V=28305.4022400
=11793.91 m3
Assumed no of Tanks = 4
Volume of basin = V/4
=11793.91 / 4
=2948.44 m3
Assumed Depth = 6.5
Width to depth ratio = 1.5 : 1
Width = 6.5*1.5 = 9.5
=10 m
Length of the tank = Volume of tank /width * depth
=2948.44/ 10*6.5
=46 m
Detention time
τ=VQ
τ=29900110241.6
=6.5 h
Fraction of VSS
Fraction VSS=XVSS∙VXTSS∙V
Fraction VSS=18665.5528305.402
=0.659
MLVSS
MLVSS=Fraction VSS*MLSS
=0.659*2400
=1582.642 g/m3
Volumetric BOD
Lorg=Q*SOV
Lorg=110241.6*100.511793.91
=0.939 Kg/m3.d
Observed Yield based on VSS
Yobs,TSS=PX,TSSQ∙(SO–S)
Yobs,TSS=8850.97110241.6∙100.5–1.4774
=0.810 gTSS/g bCOD
Yobs,VSS=Yobs,TSS*VSSTSS
Yobs,VSS=0.63*0.816
=0.5142 g VSS/gBOD
Oxygen Demand
Ro=Q (So – S) – 1.42Px,bio + 4.33 Q (NO3)
=110241.6(100.5-1.499) – 1.42*5836.63 + 4.33*110241.6*47.1994
=1393.62 Kg/h
Mass of Alk needed as CaCO3 for nitrification
Alk used for nitrification = 7.14g CaCO3 g NH4– N*NOx g/m3
=7.14*47.1994
=337 g/m3 used as CaCO3
Alk to be added = Alkalinity – pH -Influent Alk + Alk used
=80 – 269 +337
=148
Alk to be added = 110241.6*148/1000
=16315.756 Kg/d as CaCO3
Na(HCO3) needed =Alkalinity needed as CaCO3 * Equivalent amt of Na(HCO3) / Equivalent weight of CaCO3
=(163150456 +80)/ 50
=27410.47 Kg/d Na(HCO3)
Phosphorous Removal
P removal design requirement
NO3 = 27 mg/L
NO3-N in RAS
NO3-N in RAS = NO3-N = Total N -NH4-N
=27-1
=26 mg/L
Nitrate mass balance at influent in the reactor
NO3-Nreact = NO3 RAS * Q / Q + Qr
=(26*110241.6*0.6) / (110241.6 + (110241.6 * 0.6))
=9.75 mg/L
rbCOD available for P removal
rbCOD equivalent = NO3 react * 6.6
=9.75*6.6
=64.35 mg/L
rbCOD available for P removal
rbCOD available for P removal =rbCOD influent – rbCOD equivalent
but rbCOD influent = 0.25(1.6*BOD)
=0.25(1.6*100.5)
=36.15 mg/L
Phosphorous removed by BPR mechanism
Bio P removal = rbCOD available for P removal / (ratio of rbCOD/BOD)
=36.15 / 8
=4.518 mg/L
P used for heterotrophic biomass synthesis in addition to phosphorous storage due to BOD
Px,bio= A + B
= 4962.760 + 477.10325
=5439.86 Kg/d
P used for biomass growth = pH content of heterotrophic biomass * Px,bio
=0.015 * 5439.8
=1.22 mg/L
P removed = Bio p removed + Pused for biomass
=4.158 + 1.22
=5.7387 mg/L
P content of waste sludge
Total P in sludge = p removed * Q / 1000
=(5.7387 * 110241.6) / 1000
=632.54 Kg/d
P % = ( Total P in sludge/ Px,TSS) * 100
=(632.54 * 100) / 8850.97
= 7.146 %
Denitrification
Active biomass calculation
Xb=Q∙SRTVY∙(So–S1+kdSRT
Xb=110241.6∙3.198117930.6∙(100.5–1.49971+0.13.198
=1345.78 mg/L
Internal recycle ratio
IR=NOXNoxeffluent–1–R
IR=47.19946–1–0.6
=6.266
Amount of NO3-N to the anoxic tank
Flowrate to anoxic tank = IR * Q + R * Q
=6.266*110241.6 + 110241.6 * 0.6
=756980.93 m3/d
NOx= feed = Qanoxic * NOx effluent
(756980.93 * 6) / 1000
=4541.88 Kg/d
Volume of anoxic tank
Vnox = τ * Q
=0.05 * 110241.6
=6429.98 m3
SDNR
SDNR = 0.42
Amount of NO3-N that can be reduced
NOr = Vnox * SDNR * MLVSS
=6429.98 * 0.42 * 1582.642
=7094.68 kg/d
Capacity ratio
Capacity ratio = NOx / NOx feed
=7097.68 / 4541.88
=1.56
>T =1.4 therefore acceptable
Airflow rate
SOTR=AOTRCs,20α∙F∙(β∙CS,T,H–CL
SOTR=766.669.080.65∙0.9∙(0.95∙908–2
=1795.8 Kg/L
Air Flow Rate=SORTE*0.27*60
Air Flow Rate=1795.80.3*0.27*60
=369.50 m3/min
Alk to be added = alkalinity – pH – influent Alk + Alk used – Alk produced – denitrification
=80 – 269 -337.003
=148.003 g/m3
Mass of alkalinity needed
Mass of alk needed = Alk to be added * Q /1000
=(148.003 * 110241.6) / 1000
=16316.098 Kg/d CaCO3
Anoxic zone mixing energy
Anoxic zone mixing energy = V * Mixing energy
=6429.98 *10 / 1000
=64.29 KW
Secondary clarifier Design
Return sludge recycle ratio
RAS recycle ratio = Qr / Q
=(110241.6 * 0.6) /110241.6
=0.6
Size of clarifier
Area = Q / hydraulic application rate
=110241.6 / 22
=5010.98 m3
Area per clarifier = Area / No of clarifier
=5010.98 / 3
=1670 m3
D= 4*Areaπ
D= 4*1670π
=46.12
=46 m
A=π4*D2*3
A=π4*462*3
=4983 m3
Solid loading
Solid Loading=1+RQMLSSA
Solid Loading=1+0.6110241.6*2400)4983*24
=3.53 kg MLSS / m2 h
APPENDEX -F
BIOWIN MODEL
7.References
( ; ‘BioWin ‘ ; ‘Chapter 7 – Metcaf Eddy 2015’ ; ‘Chapter 8 – Metcaf Eddy 2015’ ; ‘Enhanced biological phosphorus removal and its modeling for the a.pdf’ ; ‘ Finalthesis_TU ‘ ; ‘lagoon-pond-treatment-2011’ ; ‘Model history’ ; ‘Seasonal influent characterization model calibration SRT and en’ ; A.Sathasivan ; Bechmann ; Bekir Ersu et al. 2008; Council ; E MOrgenroth ; Jokela et al. 2002; Metcalf, amp & Eddy 2003; Metcalf et al. 2002; N.Banadda ; Sh.Mardani ; Stensel & Shell 1974; Tomaszewska & Mozia 2002; Zeng et al. 2010; Zeng et al. 2011) .
A.Sathasivan, ‘Biological Phosphorous Removal Process for Wastewaster Treatment’.
Bechmann, H., ‘Modeling of Wastewater Systems’.
Bekir Ersu, C., Ong, S.K., Arslankaya, E. & Brown, P. 2008, ‘Comparison of recirculation configurations for biological nutrient removal in a membrane bioreactor’, Water Research, vol. 42, no. 6,pp. 1651-63.
‘BioWin ‘.
‘Chapter 7 – Metcaf Eddy 2015’.
‘Chapter 8 – Metcaf Eddy 2015’.
Council, R.W.C., ‘Average Water Use’.
E MOrgenroth, R.K.a.P.H., ‘Process and Modelling of Hydrolysis of particulate organic matter in a Aerobic Wastewater Treatment ‘.
‘Enhanced biological phosphorus removal and its modeling for the a.pdf’.
‘ Finalthesis_TU ‘.
Jokela, J.P.Y., Kettunen, R.H., Sormunen, K.M. & Rintala, J.A. 2002, ‘Biological nitrogen removal from municipal landfill leachate: low-cost nitrification in biofilters and laboratory scale in-situ denitrification’, Water Research, vol. 36, no. 16,pp. 4079-87.
‘lagoon-pond-treatment-2011’.
Metcalf, amp & Eddy, I. 2003, Wastewater engineering : treatment and reuse, Fourth edition / revised by George Tchobanoglous, Franklin L. Burton, H. David Stensel. Boston : McGraw-Hill, [2003] ©2003.
Metcalf, Eddy, I., Tchobanoglous, G., Burton, F. & Stensel, H.D. 2002, Wastewater Engineering: Treatment and Reuse, McGraw-Hill Education.
‘Model history’.
N.Banadda, I.N.a.R.K., ‘A Review of Modelling Approaches in Activated Sludge Systems ‘.
‘Seasonal influent characterization model calibration SRT and en’.
Sh.Mardani, A.M., M.M.Amin and M.Ghasemian, ‘Determination of Biokinetic Coefficients for Activated Sludge Process ‘.
Stensel, H.D. & Shell, G.L. 1974, ‘Two Methods of Biological Treatment Design’, Journal (Water Pollution Control Federation), vol. 46, no. 2,pp. 271-83.
Tomaszewska, M. & Mozia, S. 2002, ‘Removal of organic matter from water by PAC/UF system’, Water Research, vol. 36, no. 16,pp. 4137-43.
Zeng, W., Li, L., Yang, Y., Wang, S. & Peng, Y. 2010, ‘Nitritation and denitritation of domestic wastewater using a continuous anaerobic-anoxic-aerobic (A(2)O) process at ambient temperatures’, Bioresour Technol, vol. 101, no. 21,pp. 8074-82.
Zeng, W., Li, L., Yang, Y.Y., Wang, X.D. & Peng, Y.Z. 2011, ‘Denitrifying phosphorus removal and impact of nitrite accumulation on phosphorus removal in a continuous anaerobic-anoxic-aerobic (A2O) process treating domestic wastewater’, Enzyme Microb Technol, vol. 48, no. 2,pp. 134-42.
Cite This Work
To export a reference to this article please select a referencing stye below:
UKEssays. (November 2018). Design of a Wastewater Treatment Plant. Retrieved from https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1
Copy to Clipboard
Reference Copied to Clipboard.
“Design of a Wastewater Treatment Plant.” ukessays.com. 11 2018. UKEssays. 12 2023 <https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1>.
Copy to Clipboard
Reference Copied to Clipboard.
“Design of a Wastewater Treatment Plant.” UKEssays. ukessays.com, November 2018. Web. 7 December 2023. <https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1>.
Copy to Clipboard
Reference Copied to Clipboard.
UKEssays. November 2018. Design of a Wastewater Treatment Plant. [online]. Available from: https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1 [Accessed 7 December 2023].
Copy to Clipboard
Reference Copied to Clipboard.
UKEssays. Design of a Wastewater Treatment Plant [Internet]. November 2018. [Accessed 7 December 2023]; Available from: https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1.
Copy to Clipboard
Reference Copied to Clipboard.
{{cite web|last=Answers |first=All |url=https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1 |title=Design of a Wastewater Treatment Plant |publisher=UKEssays.com |date=November 2018 |accessdate=7 December 2023 |location=Nottingham, UK}}
Copy to Clipboard
Reference Copied to Clipboard.
All Answers ltd, ‘Design of a Wastewater Treatment Plant’ (UKEssays.com, December 2023) <https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1> accessed 7 December 2023
Copy to Clipboard
Reference Copied to Clipboard.
Related Services
View all
DMCA / Removal Request
If you are the original writer of this essay and no longer wish to have your work published on UKEssays.com then please:
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download