Many at times we are involved in or come across construction works and bear testimony to amazing structures and beautiful scenery that results, thanks to a well-organized, planned, reviewed, executed and controlled processes involved. However, there are instances where there are failures in construction works either on the building itself/ site location or loss of life and injury of the personnel involved or both. Specifically, such instances result in sites where health and safety procedures, processes or considerations are not adequately emphasized, organized, planned, monitored and reviewed (Hughes & Ferret, 2016). Based on this information, this section focuses to offer a detailed proposal and suggestion to health and safety in construction while considering the provision of suitable site access and storage locations for the various materials needed for the construction and those materials requiring disposal from a site.
The site will be served by the main road and a link road from the side as indicated on the sketch plan of the site. Demolition of old structure will be done before the inception of construction and demolition materials disposed of. Blocks, bricks and concrete portion from demolition will be used to compact and level the site and as a fill material in the foundation of the new building. Glass and plastic wastes from demolition will be stored at storage B (for demolition waste) and be released to the county waste disposal unit for safe disposal within two weeks from the time of demolition. Wood from demolition will be used to supplement other wood/ timber supply for the erection of the building construction storage sites B. generated soil from demolition shall be cut away from the site. The site plan is as shown in figure 1.
MAIN BUILDING UNDER CONSTRUCTION |
|
Preparation of the site will entail clearance of the site, geotechnical report, grading, excavation, and compaction. Investigation and assessment on surface and subsurface conditions shall be conducted thoroughly. The assessment is relevant since it helps determine present and installation of ground services based on recommendations on the site geotechnical report. Excavations volume will be determined and suitable drainage, structural elevation be conducted with utmost precision as per the designs.
Subsequent to accomplishing and deciphering test results, sort of establishment suitable for the site, settlements and related proposals, liquefaction potential outcomes, incline solidness, groundwater level, soil bearing limit, exhuming related perils, soil quality, soil grouping, and numerous more data are given in the geotechnical reports.
After the design of the structure is set precisely, the uncovering work starts and the soil is evacuated to a required profundity in which the establishment of the structure is set.
There are different kinds of hardware/ equipment used to exhume and transport soil at task site. The choice of the sort of apparatus utilized for exhuming depends on the soil kind, to what extent is the separation the soil should be transported, soil site capacity to convey load, and site openness.
For example, impacting, penetrating, and apparatus like stones, excavator, scoops, and scooper are included to exhume and transported impacted and bored materials when rocks are available at the site. Grading at a built site is extremely urgent to drive water far from the structure. Global Building Code (IBC 2009), gives a fundamental proposal to make legitimate grading. The Code expresses that review slant ought to be no less than one unit vertical to twenty units even as such 5% at a separation of 3m estimated opposite from the divider confront.
In the event that a flat separation of 3 m isn’t accessible because of physical frustrates, at that point, different alternatives should be utilized, for example, swales and impenetrable surface for which minimum slant ought to be 2% if is situated inside the breaking point of 3m. The IBC code allows the least slant of one unit flat to forty-eight-unit vertical under specific conditions.
On the off chance that the building site isn’t level, at that point, reasonable slicing and rounding should be completed and they both cut and fill volume is directed by the most minimal level position of the structure. The soil underneath establishment at site development must be compacted to the required degree which according to IBC Code is 90% of the greatest dry thickness. Compaction of soil layers which bolster loads is an absolute necessity since it diminishes settlement and thus forestalls undesired occurrences.
Packing, rolling, and vibration is kinds of burdens utilized to minimize soil layers. There are a few machines utilized for compaction at the building site, for example, smooth wheel roller, sheep foot roller, elastic tire, crawler, and packing plate compactor. Not exclusively does the compaction of soil enhance shear quality yet, in addition, it decreases soil porousness and compressibility (Hughes & Ferret, 2016).
Materials needed during early phases on construction and construction of the main structure, hazards they present and measures to reduce the risks to the people working on the site are as tabulated below:
Material |
Hazard |
Measures to reduce risks |
Cement |
Skin problems such as dermatitis |
Workers to wear protective gloves, clothing |
Packaging and timber offcuts |
Flammable- can easily cause a fire |
Should be cleared away regularly to reduce fire risks |
Chemicals and solvents |
Accidental ignition |
Stored away unless while being used |
Flammable paints and glues |
Suffocation, fire risks |
Increase ventilation standards |
Timber |
Physical injury |
Carefully arranged and away from walkways, stairways, paths |
Adhesives |
Fire risk |
Regularly cleared away if not used and away from places where accidental ignition is probable Use water-based or low solvent adhesives |
Soft furnishings |
Fire risk |
Regularly cleared away if not used and away from places where accidental ignition is probable |
Trailing cables |
Tripping/ physical injury |
Carefully placed and marked for awareness |
Guardrails and toe boards |
Edge injuries or vulnerability |
Provide edge protection |
Bricks or concrete |
Side-on loading effects Fall accidents and injuries |
Making steps facing the working actor and not contrary Support steps from tipping over or tying to a suitable point |
Barriers or covers |
Fall accidents due to accidental failures |
Use nets to mitigate the consequences should a fall occur |
Lifting materials to the roof |
Material wastage and loses, fall accidents, poor workmanship |
Provide safe access to the roof A safe way of lifting materials to the roof Maximum load to be carried up a ladder to be 10 kg |
Hazardous materials e.g. acids, lead paint |
Contamination |
Proper removal and safe disposal before demolition. Disposable overalls, full-face respirators, ventilated enclosures |
Solvent-based paints and materials |
The risk of exposure to skin and contamination |
Do not apply by spraying Use a roller with a splash guard Apply by brush |
Task 2
Environmental impacts of cement
Over time, there has been justified concerns on use of sustainable, safe, cheaper, biodegradable etc. forms of materials in constructions mainly to check on wastes resulting from their use as well as environmental impacts, costs, reliability, sustainability etc. such alternatives should never be ignored especially in construction so as to produce a sustainable fit and efficient structure. For instance, cement as a construction material has been significantly modified and varied so as to improve its use as well as efficiency. This section aims to explore the arguments for and against the use of cement based on environmental and sustainability viewpoint and a comparison of its form possible used 50 years ago in construction works.
CaCO3 (limestone) + warm – > CaO (lime) + CO2
Production of one ton of bond results in 780 kg of CO2.Of the aggregate CO2 yield, 30% gets from the utilization of vitality and 70% outcomes from decarbonation. Important to acknowledge is that in spite of the fact that 5% of the overall age of CO2 is because of bond creation, that level of yield additionally mirrors the exceptional and all-inclusive significance of cement all through the development business. A chart below summaries the environmental impacts of cement.
Figure showing the environmental impact of cement.
Figure showing GHG emission by industry.
Furthermore, it has been noted that cement extraction and processing results in landscape degradation, loss of agricultural land, loss of aesthetic value and beauty of environment causing visual impacts, and noise, pollution, and energy consumption during transportation and manufacturing processes.
Environmental impacts of concrete (extraction point)
Environmental impacts of concrete (Land degradation)
Environmental impacts of concrete (pollution hazards-air, land etc.)
Sustainability of cement
Cement is the dynamic constituent of solid which will assume an undeniably vital job in future CO2 moderation, through upgrades in vitality proficient building techniques. A real program of the World Business Council for Sustainable Development; the Cement Sustainability Initiative (CSI) has been concentrating on comprehension, overseeing and limiting the effects of concrete creation for more than 10 years ( Clark, 2010). This is a worldwide exertion by 18 of the world’s driving bond makers who speak to around 30% of the world’s concrete generation.
With key atmosphere arrangements occurring this December at the COP15 talks in Copenhagen, crafted by the CSI amid 2009 has been thought around conveying a few noteworthy reports; concentrating especially on the manageable eventual fate of bond. A standout amongst the most essential ventures attempted so far by the CSI is the advancement of a complete financial and arrangement displaying program; intended to analyze the possibility of a Sectoral Approach to ozone-depleting substance alleviation (Clark, 2010). The discoveries, distributed in May, feature four potential strategies that can add to decrease; enhancements in vitality effectiveness, expanded utilization of elective fills, extra mixing and carbon catch, and capacity. The displaying likewise demonstrates that a huge decrease in discharges could be accomplished by receiving a sectoral approach in the cement business; when contrasted with the base case.
A great part of the information required to build up the model was drawn from another vital task attempted by the CSI – Getting the Numbers Right (GNR). The GNR framework is a division-wide worldwide data database that gives precise, checked information on the bond business’ CO2 emanations and vitality execution. Notwithstanding CSI individuals, CEMBUREAU, the European Cement Association, gathers data from non-CSI concrete plants in Europe, guaranteeing almost total inclusion of all bond establishments there. The database is autonomously overseen by Pricewaterhouse Coopers (PwC), who give information security to oversee antitrust and classification concerns. GNR demonstrates that a successful estimating, revealing and confirmation (MRV) framework can be produced and overseen by an industry (Issa, 2014). Besides, dependable and a la mode outflows information is basic for emanations benchmark-setting in an area like a bond.
The work attempted on sectoral approach displaying, building up the GNR database and different ventures, – including a noteworthy new cover reusing cement, in which the CSI calls for moves towards zero landfill – fill in as proof that the bond business is a main division as far as its comprehension of potential alleviation and adjustment measures to battle environmental change.
With great portrayal from cement makers in Europe, North and South America, the CSI is presently effectively reassuring commitment and association from creating nations (Issa, 2014). The activity as of now considers Indian cement makers as a part of its individuals and a few partner discussions have been held with Chinese concrete makers, controllers, and NGOs. The desire is to incorporate Chinese organizations among the enrollment soon.
Comparison of materials that might be used for the structure 50 years ago with what might be used today are as in the tabulation as follows;
A material used 50 years ago |
Material used today |
Flint: In engineering, flush work is the beautifying blend on a similar level plane of rock and ashlar stone. On the off chance that the stone tasks from a level rock divider indicated that the stone stands “pleased” instead of being “flush” to the divider. Flint utility was for beautifying purposes where it was accessible however at times entire structures were constructed utilizing rock. |
Obsidian: These can be made utilizing the smelter in indistinguishable design from device parts. The honing pack example can be discovered upper left on the stencils set, at that point make the shape. There are different evaluations of honing unit for the different materials accessible in the amusement (e.g. Press, Steel, Knights line, and Obsidian). To apply a honing unit to an instrument, put the device, amidst a Tool Forge and the honing pack and a bit of stone in any of the vacant spaces around it. This could be mine you can overhaul or minimization your instrument Mining Level by putting the material that has the Mining Level higher than your device and the other way around. |
Soil and turf: In some northern districts the rooftops so as to maintain stickiness. Application of soil layer under a layer of turf at the house top was done to work the water out,. Houses and different structures made that way would nearly mix with whatever remains of the view making them difficult to see from separation. |
Tiles: Roof tiles are ‘hung’ from the framework of a roof by fixing them with nails. The tiles are usually hung in parallel rows, with each row overlapping the row below it to exclude rainwater and to cover the nails that hold the row below. There are also roof tiles for special positions, particularly where the planes of the several pitches meet. appearance of brick, but avoided the brick taxes of the 18th century |
Secondary materials Iron Copper and Lead: Every one of the three of these metals is utilized somehow in medieval engineering. From the assembling of nails utilized through relatively every building compose to copper and lead being utilized for channels and for the development of churches, (seepage, arches sheathing and so forth) which required materials skilled to stand the trial of time. Press poles and are additionally utilized for included basic trustworthiness in numerous military and religious structures. |
Steel and iron: Steel is a compound of iron and carbon and different components. In view of its high elasticity and ease, it is a noteworthy part utilized in structures, foundation, apparatuses, ships, autos, machines, apparatuses, and weapons. Press is the base metal of steel. Press can go up against two crystalline structures (allotropic structures), body-focused cubic and confront focused cubic, contingent upon its temperature. In the body-focused cubic plan, there is an iron particle in the middle and eight iotas at the vertices of each cubic unit cell; in the face-focused cubic, there is one molecule at the focal point of every one of the six essences of the cubic unit cell and eight molecules at its vertices. |
Lime Mortar: Lime mortar or mortar was made by removing the stone from a limestone quarry (lime works) which was then prepared into a lime furnace with the end goal to be rendered into a pliable frame (brisk lime). This enabled Lime to be utilized for building, rendering, putting and lime washing building. Lime control was additionally utilized as mortar in the middle of stone pieces which gave great protection to the building. In areas that Limestone couldn’t be discovered, clam shells were utilized in ovens with the end goal to deliver a fundamentally the same as material. |
Cement mortar: Mortar is a useful glue used to tie building squares, for example, stones, blocks, and solid brickwork units together, fill and seal the unpredictable holes among them, and once in a while include enriching hues or examples in workmanship dividers. In its broadest sense mortar incorporates pitch, black-top, and delicate mud or dirt, for example, utilized between mud blocks. Mortar originates from Latin mortarium significance smashed. Bond mortar turns out to be hard when it fixes, bringing about an inflexible total structure; anyway, the mortar is expected to be weaker than the building squares and the conciliatory component in the brickwork, in light of the fact that the mortar is less demanding and more affordable to repair than the building squares. Mortars are ordinarily produced using a blend of sand, a folio, and water. The most widely recognized folio since the mid-twentieth century is Portland bond however the antiquated fastener lime mortar is as yet utilized in some new development. Lime and gypsum as mortar of Paris are utilized especially in the repair and repointing of structures and structures since it is critical the repair materials are like the first materials. The sort and proportion of the repair mortar are controlled by a mortar examination. |
Clay and brick: clay was anciently used as an important part of daub and in pottery until the techniques of making fire bricks from burnet clay which gave a more hard structure. Bricks developed from Italian peninsula from roman times and eventually being used in England as a construction material in construction of walls and permanent dwellings. |
Stone and concrete:. Stonework is, for the most part, an exceptionally tough type of development. Be that as it may, the materials utilized, the nature of the mortar and workmanship, and the example in which the units are amassed can considerably influence the toughness of the general brickwork development. |
Logs and lumber: Wood was an essential piece of the greater part of the structures amid the medieval times. Basically, the greater part of the confining of a house and in addition the rooftop structure was made of wood. In England, Oak was utilized broadly because of its solid protection from moist climate. Despite the fact that a vital component of numerous structures, exclusively wooden houses were not all that regularly utilized. Wood was however utilized in military structures previously the presentation of the Norman stone protections. In reality, a large number of the trespassers of England conveyed wooden cautious structures prepared for gathering (Like IKEA level pressed yet somewhere in the range of hundred years prior). Wood was likewise utilized for the development of essential framework like scaffolds |
Timber and wood: It furnishes extraordinary advantages when joined with sharp arranging, high exactness and very much observed development and brilliant usage. The utilization of timber outlines the world over is extremely prominent. There is no distinction when we come to utilizing timber in off-site development of homes. Timber outline homes are frequently thought of as a lightweight type of development, yet don’t be deceived. It is a uniquely crafted structure that is amazingly solid and sturdy. There are numerous focal points to timber outline development, however, its best-known quality is its ecological perfection. When utilizing timber to work off-site development of new homes, there is a high level of adaptability. Transportation costs are brought down because of the way that timber is lightweight. The segments in a timber outline weigh less and can be utilized on brownfield destinations or locales with troublesome land conditions. |
Task 3
Advantages of Structural Steel Structures
Disadvantages of Structural Steel Structures
Wrought/Fashioned Iron truly signifies ‘worked press’, which alludes to the technique for assembling the metal by working (beating) over and over under a sled it is a similar procedure that steel specialists have utilized for a long time whether it be making swords or steed shoes. Crafted by the metal forger accordingly ended up known as ‘Created Ironwork’, a name that has persevered for the fine art despite the fact that the metal being used may not be fashioned iron (Fan, 2011).
Fashioned Iron’s unrivaled weathering properties that are generally outstanding. Wrought iron is known for its toughness and will last a huge number of years, its special properties enable it to oppose corrosion. Simply take a gander at the measure of Wrought iron in legacy destinations and structures that are more than 300 years of age Mild steel can last up to 60 years with reasonable stirring.
Wrought Iron is milder to fashion, as it is serviceable at a higher warmth than gentle steel making it progressively ‘moldable’ under the mallet (Fan, 2011). Astonishing lavish shapes can be controlled into the metal to make staggering entryway plans with no obvious welds.
Today the regular material adopted is mild steel which is a more affordable, promptly accessible and requires a lower ability level to deliver entryways than fashioned iron. Use of Wrought Iron and steel-for by far most of the private homes mild steel is most reasonable item basically on weight and cost (Fan, 2011). A significant match of created press entryways could be as much as 10 times the expense of its mild steel partners. It is additionally critical to think about that “created press” beams and columns are commonly heavier and substantial entryway robotization will be required.
Hence, wrought iron is far more expensive and manufacture and heavier (about ten times more than steel) and can be mass produced compared to steel. Use of wrought therefore would demand more extractions, more manufacturing, and possible collapse and failure of building due to excessive and unsustainable weights hence impacting soil foundation failure envelopes, land degradation at mines as well as high pollution at the manufacturing plants when its use is intensified.
The material adopted would be used to design beam and columns able to support tension within members of the structures as well as measures on compression, deflections of members. The wrought would be modified in thickness to sustain tension and compression in the members hence applying ultimate limit state design principles.
Test for tensile strength procedure
Through standard procedures employed at tests and calibration of equipment so as to ensure tests are conducted at specific and optimum conditions hence minimizing any variations that would result hence various test results can, therefore, be fairly compared regardless of the location of the test.
Maximum vertical load/critical load=
Assumed factor of safety =1.
Figure on Young’s modulus for structural steel
Task 4
Schedule energy efficiency audit for the building regularly.
The measure of performance of a heat pump is also expressed in terms of the coefficient of performance and it is defined as Therefore, the power input to the heat pump is
The power input to the heat pump,
Reference
Andamon, M.M., 2010. Building climatology and thermal comfort: thermal environments and occupant (comfort) responses in Philippine office buildings.
Clark, W.W., 2010. Sustainable communities design handbook: green engineering, architecture, and technology. Burlington, MA: Butterworth-Heinemann.
Construction: health and safety, 2009. Kingston upon the Thames: Wolters Kluwer Ltd.
Fan, J., 2011. Multiscale analysis of deformation and failure of materials. Chichester, West Sussex: Wiley.
Hughes, P. and Ferrett, E., 2016. Introduction to health and safety in construction: for the NEBOSH national certificate in construction health and safety. London: Routledge, Taylor & Francis Group.
Issa, R. and Flood, I., 2014. Computing in civil and building engineering: proceedings of the 2014 International Conference on Computing in Civil and Building Engineering: June 23-25, 2014, Orlando, Florida. Reston, VA: American Society of Civil Engineers.
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download