Discuss About The Monitoring Auditing In Sap Enterprise Planning.
“Enterprise resource planning (ERP)”, is considered as integration of the core business process which often takes place in the real time and the same is mediated among the “software and technology”. Some of the main categorization of the ERP module has been included with the integration of the various types of the components which are seen to be associated to the procurement, production (PLM), distribution, accounting, human resource, corporate governance performance, customer services management and sales. The procurement functions are carried out with the maximization of the cost savings with the support for the end to end procurement and beneficial in terms of the planning and optimization of the manufacturing capacity along with material resources. s
The production planning through SAP is considered as the important factor for the all the key modules to handle the capacity planning, execution of production and planning of material, bill of material and movement of goods. In general, the SAP PP module is able to handle the master data with maintaining a master data which is required for the “Bill of Materials (BOMs) activity”, routing of materials and maintaining a separate component. It needs to be further discerned that the SAP PP module is seen to be varying as per the as per the nature of manufacturing industry.
Some of the main discourse of the report aims to implement the ERP system in a manufacturing process environment. The various sections of the study have covered the development of the business requirements and determination of the business requirements which are seen to be in line with the various types of the adjustment allowed within the ERP system. The ERP system has allowed for the overall determination of the system requirements along with the software and vendor selection. Some of the other sections of the repot has been conducive in terms of addressing the ways in which the organizations are depicted to utilize such a technology for improving the efficiency of the business. The later excerpts of the have also discusses about the significant challenges in the overall implementation process.
The company is seen to be involved in the manufacturing operation of the steel which are seen to be based on producing flat steel with the main operations in the “Australia, New Zealand, Pacific Islands, North America, and Asia”. The company is depicted to be headquartered in Melbourne, Victoria. The total employee strength of the company is depicted with 16000 personnel and aims to be one of the largest steel plant in Australia. The business will further aim to compete with the various types of the companies which are depicted to be operating in Australia in the same field. Some of the notable mentions of such companies include Orrcon Steel, Whyalla Steelworks, Lysaght (Australian company), Arrium and Astra Resources plc (Ning et al. 2015).
The business process of the business comprises of the producing steel from the iron ore and scrap. Some of the main activities in the steel manufacturing process has been seen to be taken into consideration with the various type of the factors which are seen to be based on the removing the components such as “nitrogen, silicon, phosphorus, sulfur” and additional carbon are separated from the “raw iron, and alloying elements such as manganese, nickel, chromium and vanadium” which is needed to produce different grades of steel (Knoll et al. 2017). Some of the manufacturing process is further included with the use of different grades of steel. This is often considered with the limiting the dissolved the gases like Nitrogen and Oxygen and the various types of the entrained impurities in the steel. This is further seen to be considered with the inclusion of the different types of the impurities which are required for ensuring that the quality of the product is casted from the liquid steel (The Library of Manufacturing 2016).
The main initiation of the business will involve the identification of the products which is needed for the manufacturing process. The second step is considered with the preparation of the feasibility report which is required to find the feasibility of producing the product selected. It needs to be further discerned that the feasibility report will be able to depict the main changes which needs to be applied both in terms of the technical and financial feasibility. This step needs to be followed with the market identification which is seen to be considered with the various types of the factors which are seen to be directly associated to the identify the technical feasibility. In the third stage the business is required to identify the various types of the factor which are seen to be associated to the tracing of the product for the sources of financing the operational cost and deciding on any new business venture (Billinghurst, Clark and Lee 2015).
The important consideration for the management of the day to day operations of the manufacturing process needs to be conducted with the different types of the activities which needs to be relied on management of the personnel and ensuring the efficiency among the business process with the integration of the finance, material procurement and the need for the marketing. The aforementioned measures taken by the company will be able to ensure that the business requirement selected for the manufacturing process are aligned with the various activities which are considered with present availability of the resources. In addition to this, the important requirement of the business needs to be ensured with the considerations of appropriate selection of the vendor. In addition, the various activities off the business needs to be also endorse that the activities of the business are taken into account with the appropriate consideration of government licenses (Singh and Best 2015).
The system requirement for the ERP process is included with the consideration of the procurement of the materials from the vendors for the manufacturer of the steel. It needs to be further considered with the various type of the procurement activities which needs to be taken into account with ensuring that the business is in line with the “RFQ (request for quotations)” in the ERP system. This has been depicted to be to be conducive for the making the PO for the raw materials. The raw materials which the company intends procure is seen to be based on the bids which is chosen among the vendor for making the PO for the raw material. It needs to be further understood that the material the company wants to procure should be having the appropriate “MMR(Material master record)” and for the vendor “(Vendor master record)” (Bromiley et al. 2015).
On the other hand, it needs to be prepare its system for any instance of contingency. It is seen that if the company doesn’t want to go for the “RFQ”, which can be made directly made with the “PR (Purchase requisition)” and preparation of the PO. Post generation of the PO in the ERP system the companies need to ensure that there is sufficient amount of goods receipt and which the vendors needs to use with the MIRO invoice receipt. In addition to this, the important aspects of the procurement process for the business needs to be based on the several types of the considerations which needs to be taken into account with the consideration of the different type of the factor associated to as getting the “finished product from the subcontractor and giving him the semi-finished product” (Ning et al. 2015). This can be fulfilled by the company ibn terms of the procurement of the materials by maintaining an SO in the ERP system. Some of the different types of the other requirement of the products needs to be made in the compliance with the location factors (Markandeya and Roy 2014).
The ERP system need to appropriately account for the locational factors which are associated to the location of the plants and ensure that the same is updated in the ERP system. The ERP system is also required to made the make the necessary provision which will be able to account for the provision for the stock transfer and transfer posting scenario within the ERP system (Campbell 2016).
The main selection of the software for the present process is considered with the application of the SAP MII in the manufacturing plant of the company. The essential features of the software will be conducive for the business in terms of the ensuring that the various types of the procedures for the business are taken into consideration as per the other manufacturing industries which are critical for “recording, monitoring, and reporting” (Ferlay et al. 2015). The functional scope of the of the software has been identified with the various type the process included in the planning of the ERP consists of the activities such as Plant Synchronization with the Business Processes, Manufacturing Data Objects, perfuming the activities for the MII based Worker UI and performing the various types of the actions which are taken into account with Shop Floor Actions and Data (Board 2017). The fundamental scope of the software is further depicted with the diagram as follows:
Figure: Functional Scope of SAP
(Source: Sapevent.ch. 2018)
This software will be fulfilling the requirements of the manufacturing process by consideration of the discrete steel producing company which is relevant to the present scope of the requirement of the repot. TI needs to be further discerned that the different types of consideration for the SAP process will be included with the process for the production order, capacity requirement, material requirement and batch details.
Figure: SAP MII for Steel manufacturing
(Source: Sapevent.ch. 2018)
Some of the different type of the other functional scope of the model has been further identified with the consideration of the batch manufacturing operations which is included with the PP-PI data model for the process industry. The manufacturing process of the company will be hugely benefitted with the application of this process. This particular consideration is identified to be conducive with the different types of the activities such as segregating the manufacturing process as per work preparation, work execution, documentation and performance functions. The application of this software into the current manufacturing process will conducive in various ways which will be able to ensure the preparation of the manufacturing order list, work instructions, quality control and production confirmation. In addition to this the various functions associated to the documentation will be ensured with the consideration of the actions related to the maintaining of the shift book, monitoring and logging process.
Figure Packaged batch solution offered by SAP for manufacturing
(Source: Tutorials Point 2015)
The ERP system such as SAP has allowed the enterprises to achieve a significant amount of improvement in the plant performance, improvement in terms of the timely delivery, improvement in the quality, reducing the overall percentage of the defects, increasing the return on assets and minimizing the manufacturing costs (Stoyanov and Diderich 2017). The three ways of bringing efficiency in the organizations are listed as follows:
In general, the organizations are able to identify the key benefits of the ERP process with the use of various types of the initiatives which are associated with improving the speed and accuracy of the overall process. The use of ERP system like Sap has allowed the organizations to receive a considerable amount invoices in electronic form thereby reducing the need to paper. It needs to be also discerned that the application of several types of the technologies by the organizations has been conducive in terms allowing the companies to process faster, cost efficient and increase the operational efficiency (Wu 2014).
Secondly the ERP system is identified to be responsible for automation of the workflows thereby increasing the overall speed of the process and improving the overall efficiency. Despite of such measures the use of smart applications has been also conducive for the companies in the implementing of the smart applications and robotic process automation thereby bringing improvement as much s possible. The various types of the applications which are discerned to be used for the artificial intelligence is also depicted to be conducive for the organizations in terms of the bringing the various types of the functions which are considered to be eliminating the redundant work and saving a considerable amount of time for processing, thereby allowing the business to focus on a more valuable task (Wolch, Byrne and Newell 2014).
Some of the other direct benefits are associated to consider the cloud-based solutions which are seen to be related to provide several flexible pricings due to the modern design of the software. It needs to be further understood that the application of such a software has been beneficial for the moving the consumer process, content centric which have a relatively self-contained cloud platform. Typically SAP HANA cloud platform allows a seamless connectivity on- promise and new cloud components (Kiselicki, Josimovski and Stepanoska 2016).
The level of technology implementation is discerned to be conducive for the business to closely monitor the production planning and control activities. In addition to this, the SAP PP is closely associated to the SAP ERP modules. The SAP ERP modules will be conducive in integrating the “SAP Sales and Distribution (SD)”, “SAP Material Management (MM)”, “Quality Management, Finance Accounting”, and “Project System”. The SAP PP and SAP MM module will be conducive in tracking of the movement of the goods and track the auto goods receipt. Some of the various types of the other elements of the module will include the “creation of a reservation for Production Order/Planning”. These modules will be also conducive in creating a reservation for the production order/ planning.
Figure: Production Planning Details in SAP
(Source Markandeya and Roy 2014)
The integration of the SAP PP and SAP SD will be able to check the availability of the material for the production order. In addition to this, it is conducive for performing the MRP Run identify the type of the requirement. In addition to this this directly helpful in integrating the various elements of the Bill of Material components and operation. Additionally, the integration of this model with the SAP PP and SAP FICO has been taken into account with updating the price of the material and master data. It will be further able to define the activity type in the cost center and at the same time assign the type to the cost center. This also seen to be useful for the cost estimation and production cost controlling.
Figure: Procedure of recording BOM
(Source: Tutorials Point 2015)
A breach in the cyber security of a company can completely devastate a company. The loss of the sensitive data information may lead to several concerns in the future which are related to the loss of “sensitive data, data, fraud, lawsuits and recovery expenses” along with significant nature of the PR nightmares which can easily grow further in the future. It needs to be also understood that the 2017 ERP Cybersecurity Survey the predicted average cost of security breach in Sap is estimated at $ 5 million and more than one third of the respondents have estimated a damage of more than $ 10 million. SAP is further depicted to be relied on a complicated software platform thereby having a fair share of the vulnerabilities (Schneider-Simon and Schneider-Simon 2018).
In 2013, the USIS a federal contractor has determined several instances of infiltration by the cyber attackers. This has been identified with a security of more than 25,000 government workers being compromised. USIS lost more than $ 2.8 billion in contracts. The management of needs be particularly aware of the other risks like:
The risk of outdated unsupported software is seen to be associated to the various type of the concerns which are seen to be associated to the crashes and integration issues. The old versions of SAP may be compatible to the integration of the various considerations for the newer products (Adam Bluemner and Adam Bluemner 2014).
The top reason for the lack of functionality has been seen to be evaluated with the varies types of the factors which are related with the concerns such as loosing track of the user systems.
The organizations have been further seen to be on the verge of the problem which are seen to be faced by the management due to the “external threats, data center procedures, and end-user security”. In several instances the access to the soft coded system is overlooked for the access for the system configuration settings.
The ERP accounting software is related to various types of the concerns which are directly associated to the delay in terms of company to update their software.
In order to stay on top of all SAP cybersecurity news, the companies need to identify the relevant nature of the risk which are associated to the identification of the vulnerability. It is important for the company to clearly define the person who is in charge of the SAP cyber security. In several cases the clarification of the “processes and roles and decision making” is essential to identify the type of ownership for the company’s SAP cybersecurity which is identified with a considerable amount of share for preventing any future occurrence for cyber threat. It is also necessary to consider the aspect to prevent the various threat of the cyber security which requires to be adopted with clear and forward thinking of leadership ideas (Rid and Buchanan 2015).
Some of the main concerns for the outdated, unsupported software needs to be dealt with is seen to be based on “upgrading to the newest versions of the software”. This will allow the companies to move to the new software altogether. In addition to this, the problem of insufficient “reporting capability can lead to external reporting and a loss of data control” (Lee, Kao and Yang 2014). This needs to be addressed with the important reason for driving the ERP purchase is considered with the various types of factors can be directly seen to be related to the different aspect of solving the problem through considering some separate personnel keeping track of the external reporting. Additionally, the organizations can look forward to establish a separate directory who will be able to keep track of the data and maintain the necessary information which are seen to be considered with the various types of the factors associated to making mandatory requirements for making the direct reporting. The organizations need to ensure that the different types of the upgrades for the software’s are not delayed, thereby prevent it from the possible threat of the cycler attackers (Haddara and Elragal 2015).
Conclusion
The main discourse of the report associated to the main manufacturing process is considered with producing steel from the iron ore and scrap. Some of the main activities in the steel manufacturing process is seen to be taken into consideration with the various type of the factors which are seen to be based on the removing the components such as “nitrogen, silicon, phosphorus, sulfur” and additional carbon are separated from the “raw iron, and alloying elements such as manganese, nickel, chromium and vanadium” which is needed to produce different grades of steel. In addition to this, the details about the determination of the system requirements is based with ensuring that the business is in line with the “RFQ (request for quotations)” in the ERP system. This has been depicted to be to be conducive for the making the PO for the raw materials. The raw materials which the company intends procure is seen to be based on the bids which is chosen among the vendor for making the PO for the raw material. If the company doesn’t want to go for the “RFQ”, which can be made directly made with the “PR (Purchase requisition)” and preparation of the PO. Post generation of the PO in the ERP system the companies need to ensure that there is sufficient amount of goods receipt and which the vendors needs to use with the MIRO invoice receipt. The main consideration for the vendor and software selection is based on the different types of the consideration for the main selection of the software for the present process is considered with the application of the SAP MII in the manufacturing plant of the company. The level of technology implementation has been discerned to be conducive for the business to closely monitor the production planning and control activities. In addition to this, the SAP PP is closely associated to the SAP ERP modules. The SAP ERP modules will be conducive in integrating the “SAP Sales and Distribution (SD)”, “SAP Material Management (MM)”, “Quality Management, Finance Accounting”, and “Project System”. In terms of mitigating the threats it is important for the company to clearly define the person who is in charge of the SAP cyber security. In several cases the clarification of the “processes and roles and decision making” is essential to identify the type of ownership for the company’s SAP cybersecurity which is identified with a considerable amount of share for preventing any future occurrence for cyber threat.
References
Adam Bluemner, F. and Adam Bluemner, F. (2014). 5 ERP Security Risks to Be Aware Of – ERP Software Blog. [online] ERP Software Blog. Available at: https://www.erpsoftwareblog.com/2013/10/5-erp-security-risks-to-be-aware-of/ [Accessed 25 May 2018].
Billinghurst, M., Clark, A. and Lee, G. (2015) ‘A Survey of Augmented Reality’, Foundations and Trends® in Human–Computer Interaction, 8(2–3), pp. 73–272. doi: 10.1561/1100000049.
Board, E. (2017) ‘SAP SE (NYSE: SAP)’, Global Journal of Enterprise Information System, 9(1), p. 136. doi: 10.18311/gjeis/2017/15884.
Bromiley, P., McShane, M., Nair, A. and Rustambekov, E. (2015) ‘Enterprise Risk Management: Review, Critique, and Research Directions’, Long Range Planning, 48(4), pp. 265–276. doi: 10.1016/j.lrp.2014.07.005.
Campbell, S. (2016) ‘Green Cities, Growing Cities, Just Cities?: Urban Planning and the Contradictions of Sustainable Development’, in Readings in Planning Theory: Fourth Edition, pp. 214–240. doi: 10.1002/9781119084679.ch11.
Ferlay, J., Steliarova-Foucher, E., Lortet-Tieulent, J., Rosso, S., Coebergh, J. W. W., Comber, H., Forman, D. and Bray, F. (2015) ‘Reprint of: Cancer incidence and mortality patterns in Europe: Estimates for 40 countries in 2012’, European Journal of Cancer, 51(9), pp. 1201–1202. doi: 10.1016/j.ejca.2015.05.004.
Haddara, M. and Elragal, A. (2015) ‘The Readiness of ERP Systems for the Factory of the Future’, in Procedia Computer Science, pp. 721–728. doi: 10.1016/j.procs.2015.08.598.
Kiselicki, M., Josimovski, S. and Stepanoska, V. (2016) ‘USAGE OF ENTERPRISE RESOURSE PLANNING SYSTEMS IN SMALL AND MEDIUM ENTERPRIS…: EBSCOhost’, Journal of Sustainable Development (1857-8519), 6(16), p. 16. Available at: https://web.a.ebscohost.com.glos.idm.oclc.org/ehost/detail/detail?vid=0&sid=c6418dfe-07de-45bb-9f55-94e95282e567%40sessionmgr4007&bdata=JnNpdGU9ZWhvc3QtbGl2ZSZzY29wZT1zaXRl#AN=120463987&db=bth.
Knoll, H., Ocylok, S., Weisheit, A., Springer, H., Jägle, E. and Raabe, D. (2017) ‘Combinatorial Alloy Design by Laser Additive Manufacturing’, Steel Research International, 88(8). doi: 10.1002/srin.201600416.
Lee, J., Kao, H. A. and Yang, S. (2014) ‘Service innovation and smart analytics for Industry 4.0 and big data environment’, in Procedia CIRP, pp. 3–8. doi: 10.1016/j.procir.2014.02.001.
Markandeya, S. and Roy, K. (2014) ‘ERP and SAP Overview’, in SAP ABAP, pp. 1–20. doi: 10.1007/978-1-4302-4804-0_1.
Ning, X., Hu, B., Faisal Alessa, B. and Almuhaidib, I. (2015) ‘Ergonomic interventions for steel manufacturing workers’, Iron and Steel Technology, 12(12), pp. 36–41.
Rid, T. and Buchanan, B. (2015) ‘Attributing Cyber Attacks’, Journal of Strategic Studies, 38, pp. 4–37. doi: 10.1080/01402390.2014.977382.
Sapevent.ch. (2018). [online] Available at: https://www.sapevent.ch/landingpagesfr/Manager/uploads/1578/03_SAP_Batch_Manufacturing_2015-10-15%20MII_MFG_MII140V1_Sol_Det.pdf [Accessed 25 May 2018].
Schneider-Simon, J. and Schneider-Simon, V. (2018). Risks of SAP: How to protect your company from a cyberattack – ITOps Times. [online] ITOps Times. Available at: https://www.itopstimes.com/itsec/risks-sap-protect-company-cyber-attack/ [Accessed 25 May 2018].
Singh, K. and Best, P. J. (2015) ‘Design and Implementation of Continuous Monitoring and Auditing in SAP Enterprise Resource Planning’, International Journal of Auditing, 19(3), pp. 307–317. doi: 10.1111/ijau.12051.
Stoyanov, S. and Diderich, M. (2017) The human side of enterprise, The Human Side of Enterprise. doi: 10.4324/9781912281053.
The Library of Manufacturing (2016) ‘Shell Mold Casting’, Metal Casting Processes, pp. 3–6. Available at: https://thelibraryofmanufacturing.com/shell_mold_casting.html.
Tutorials Point (2015) ‘SAP Supply Chain Management’, in SAP, pp. 1–75. doi: 10.1017/CBO9781107415324.004.
Wolch, J. R., Byrne, J. and Newell, J. P. (2014) ‘Urban green space, public health, and environmental justice: The challenge of making cities “just green enough”’, Landscape and Urban Planning, 125, pp. 234–244. doi: 10.1016/j.landurbplan.2014.01.017.
Wu, J. (2014) ‘Urban ecology and sustainability: The state-of-the-science and future directions’, Landscape and Urban Planning, 125, pp. 209–221. doi: 10.1016/j.landurbplan.2014.01.018.
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download