Discuss About The Planning Management Ecological Restoration.
The influence of effective project planning has been largely formed to be growing and developing the effective formation of the tools and factors (White and Sholtes 2016). The formation would also be helpful for forming the utilization of the project management tools and factors. The project management tools and factors has been assisting the easing the utilization of the improved tools and aligning the synthesis for the formation of improved activities. The implication of the factors of the formation has been assisting the the analysis of the improved communication and formation.
The following assignment is a project planning document developed for the project of CRM implementation for retail organization and it would allow the use of various techniques and tools for the formation of the project. The CRM implementation would be eased by the use of the proper documentation and formation of the factors. It would also be helpful for easing the flow of the information in a synthetic plan formation process. The significant formation of the activities is helpful for forming the synthesis of the technology innovation and formation of the activities.
The major problem for the execution of the activities for the retail organization is dependent on the significant formation of the factors of formation of the innovative technology. The problems of the organization have been resulted due to the rise in the number of the customers. The increase in the number of the sales and the customers has resulted in causing problem in managing the huge amount of data that would be required for the organization. The following are the problem statements of the retail organization,
The information collection for the execution of the project of CRM implementation for retail organization would be done by using the previous information reports. According to Papke-Shields and Boyer-Wright (2017), the collection of the information from the various sources has been assisting the executing the project. The plan formation has been assisting the easing the information required for the formation of the facilities aligning the utilization of the factors for the project formation. The collection of the information would be eased with the accumulation of the information aligning to the formation of the final project reports.
The project of CRM implementation for retail organization is an IT project and hence it is bounded by the specific formation of the activities. The various constraints of the project include the factors of smart formation and formation. The time, technology dependence, and human limitation are the constraints of the project. The constraints would limit the project formation and it would also form the limitation of the activities for limiting the implication of the activities and integrating the utilization of the factors supporting the factors of integration. The various constraints of the project has been explained below,
Time: The timely actions of the activities are aligned for forming the utilization of the factors defining the support and implementation of the activities. The timed actions would align the significant formation of the factors supporting the implication of the activities. The timed action would allow the influence of the profitable formation modification. The implication of the time management process would be eased for listing the activities for defining the time limited activities.
Technology Dependency: The technology dependency is aligned with the formation of the improved utilization of the factors aligning with the project. The dependency of the technology innovation is a major factor defining the formation of the activities. The dependent technology innovation would act as a limitation for the execution of the project activities. The formation of the activities can be developed for easing the process of integrating the factors of formation for supporting the formation of the activities.
Human Limitation: The limitation of the human skills and activities would play a significant role in forming the effective utilization of the functions. The deployment of the human activities for the execution of the project formation would act both as a support and constraint for the project operation. The dependency of the human limitation would support the utilization of the activities for synthesizing the improved operation formation. The limitation of the human skills is aligned for the informal formation of the activities.
The project of CRM implementation for retail organization is an IT project and hence it is bounded by the specific formation of the activities. The information collection for the execution of the project of CRM implementation for retail organization would be done by using the previous information reports (Rieger, Stanley and Traynor 2014). The project management tools and factors has been assisting the easing the utilization of the improved tools and aligning the synthesis for the formation of improved activities. The collection of the information from the various sources has been assisting the executing the project. The objectives of the project for CRM implementation for retail organization are given below,
The statement of work is an initiation document for project that comprises of the project deliverables and due date, task lists and resources assigned to them, and costs budget of the project. The complete statement of work would be based on the deployment of the information sharing platform for the stakeholders (Marchewka 2014). It would help them in understanding the requirements of the project of CRM implementation for retail organization. The following points are included for the statement of work documentation of the project,
The project of CRM implementation for retail organization would involve the final deliverable of a developed CRM system capable of developing the improved function analysis. The project is based on the analysis of the improved operation formation for comprising the implication of the improved functional analysis (Turner 2014). The deployment of the activities would be based on the simplification of the activities for developing the influence of the improved technology. The following are the deliverables for the CRM implementation for retail organization project,
Deliverable |
Task Name |
Duration |
Start |
Finish |
1 |
Initial Documentation |
3 days |
Fri 8/3/18 |
Tue 8/7/18 |
2 |
Complete Plan |
5 days |
Fri 8/17/18 |
Thu 8/23/18 |
3 |
Complete Design |
5 days |
Mon 9/3/18 |
Fri 9/7/18 |
4 |
UI formation |
4 days |
Thu 9/13/18 |
Tue 9/18/18 |
5 |
Programming |
5 days |
Mon 9/24/18 |
Fri 9/28/18 |
6 |
Infrastructure |
7 days |
Wed 10/10/18 |
Thu 10/18/18 |
7 |
Final reports |
3 days |
Wed 10/31/18 |
Fri 11/2/18 |
The task list comprise of a number of tasks and activities that would be summed for developing the final software system implication for the organization. The tasks and activities are specifically listed in the work packages supporting the formation of phase wise project execution (Papke-Shields and Boyer-Wright 2017). The activities would be executed in forms of the section and aligned with the specific resources assigned to each of the project activities. The following table would show the execution activities along with the resources assigned to them,
Task Name |
Resource Names |
Requirement Analysis |
Analyst [Human] |
Documentation |
Documenter [Human], Documents [Material] |
Submission of Documents |
Documenter [Human] |
Review and Sign off |
Project Manager [Human] |
Kick off |
|
Plan outline |
Planner [Human] |
Review of Plan |
Project Manager [Human] |
Complete Plan Formation |
Planner [Human] |
Plan Approval |
|
Design Platform is selected |
Designer [Human], Design Tools [Material] |
Design Outline is developed |
Designer [Human] |
Review of Design |
Designer [Human] |
Complete Design is developed |
Designer [Human] |
Design Approval |
|
Design integration |
Developer [Human], System [Material], Programming Tools [Material] |
UI formation |
Developer [Human] |
Functions Formation |
Engineer [Human] |
Programming Formation |
Engineer [Human] |
System Formation |
Engineer [Human] |
Formation |
|
Implementation of plan |
Contractor [Human], Materials [Material], Equipments [Material] |
Infrastructure is developed |
Contractor [Human] |
System Formation |
Engineer [Human] |
Inspection |
Client [Human] |
Implemented |
|
Final reports |
Documenter [Human], Documents [Material] |
Submission of reports |
Documenter [Human] |
Review and Sign off |
Project Manager [Human] |
Project Closed |
The cost budget estimation is done based on the analysis of the factors of the resource usages and the rate of the resource used (Marchewka 2014). The project of CRM implementation for retail organization project would require both human and material resources for developing the final project budget. The following table would be shown for estimating the project budget as shown,
Resource Name |
Type |
Work |
Standard Rate |
Cost |
Analyst |
Human |
16 hrs |
$50.00/hr |
$800.00 |
Documenter |
Human |
64 hrs |
$55.00/hr |
$3,520.00 |
Project Manager |
Human |
32 hrs |
$85.00/hr |
$2,720.00 |
Planner |
Human |
64 hrs |
$60.00/hr |
$3,840.00 |
Designer |
Human |
88 hrs |
$65.00/hr |
$5,720.00 |
Developer |
Human |
56 hrs |
$70.00/hr |
$3,920.00 |
Engineer |
Human |
136 hrs |
$80.00/hr |
$10,880.00 |
Contractor |
Human |
80 hrs |
$75.00/hr |
$6,000.00 |
Client |
Human |
24 hrs |
$0.00/hr |
$0.00 |
Documents |
Material |
2 |
$50.00 |
$100.00 |
Design Tools |
Material |
1 |
$500.00 |
$500.00 |
System |
Material |
1 |
$3,000.00 |
$3,000.00 |
Programming Tools |
Material |
1 |
$2,000.00 |
$2,000.00 |
Materials |
Material |
1 |
$5,000.00 |
$5,000.00 |
Equipments |
Material |
1 |
$2,000.00 |
$2,000.00 |
Total Budget |
$50,000.00 |
The project has the specific goal for developing the improvement of the activities for facilitating the formation of the activities supporting the formation of the functions (Reicher, Komaromi, and Szeghegyi 2015). The utilization of the functions has been assisting the developing the formation of the activities. The simplification of the activities can be aligned for the formation of the activities in forming the utilization of functions. The information would be utilized for forming the following checklist,
The project of CRM implementation for retail organization is an IT system based project for easing the process of developing the effective and improved formation process (Sharp, Peters and Howard 2017). The management plan would be developed for easing the process of developing the formation of the execution of the project. The management plan would include the formation of the activities for successful integrating the activities supporting the execution of the improved functional analysis. The project plan would be developed using the implication of the effective program formation. The project plan for the CRM implementation for retail organization project is given below,
WBS |
Task Name |
Duration |
Start |
Finish |
Predecessors |
Resource Names |
0 |
CRM implementation for retail organization |
70 days |
Wed 8/1/18 |
Tue 11/6/18 |
||
1 |
Initialization |
7 days |
Wed 8/1/18 |
Thu 8/9/18 |
||
1.1 |
Requirement Analysis |
2 days |
Wed 8/1/18 |
Thu 8/2/18 |
Analyst |
|
1.2 |
Documentation |
3 days |
Fri 8/3/18 |
Tue 8/7/18 |
2 |
Documenter, Documents[1] |
1.3 |
Submission of Documents |
1 day |
Wed 8/8/18 |
Wed 8/8/18 |
3 |
Documenter |
1.4 |
Review and Sign off |
1 day |
Thu 8/9/18 |
Thu 8/9/18 |
4 |
Project Manager |
1.5 |
Kick off |
0 days |
Thu 8/9/18 |
Thu 8/9/18 |
5 |
|
2 |
Planning |
10 days |
Fri 8/10/18 |
Thu 8/23/18 |
||
2.1 |
Plan outline |
3 days |
Fri 8/10/18 |
Tue 8/14/18 |
6 |
Planner |
2.2 |
Review of Plan |
2 days |
Wed 8/15/18 |
Thu 8/16/18 |
8 |
Project Manager |
2.3 |
Complete Plan Formation |
5 days |
Fri 8/17/18 |
Thu 8/23/18 |
9 |
Planner |
2.4 |
Plan Approval |
0 days |
Thu 8/23/18 |
Thu 8/23/18 |
10 |
|
3 |
Designing |
11 days |
Fri 8/24/18 |
Fri 9/7/18 |
Design Tools[1] |
|
3.1 |
Design Platform is selected |
1 day |
Fri 8/24/18 |
Fri 8/24/18 |
11 |
Designer |
3.2 |
Design Outline is developed |
3 days |
Mon 8/27/18 |
Wed 8/29/18 |
13 |
Designer |
3.3 |
Review of Design |
2 days |
Thu 8/30/18 |
Fri 8/31/18 |
14 |
Designer |
3.4 |
Complete Design is developed |
5 days |
Mon 9/3/18 |
Fri 9/7/18 |
15 |
Designer |
3.5 |
Design Approval |
0 days |
Fri 9/7/18 |
Fri 9/7/18 |
16 |
|
4 |
System Formation |
19 days |
Mon 9/10/18 |
Thu 10/4/18 |
System[1], Programming Tools[1] |
|
4.1 |
Design integration |
3 days |
Mon 9/10/18 |
Wed 9/12/18 |
17 |
Developer |
4.2 |
UI formation |
4 days |
Thu 9/13/18 |
Tue 9/18/18 |
19 |
Developer |
4.3 |
Functions Formation |
3 days |
Wed 9/19/18 |
Fri 9/21/18 |
20 |
Engineer |
4.4 |
Programming Formation |
5 days |
Mon 9/24/18 |
Fri 9/28/18 |
21 |
Engineer |
4.5 |
System Formation |
4 days |
Mon 10/1/18 |
Thu 10/4/18 |
22 |
Engineer |
4.6 |
Formation |
0 days |
Thu 10/4/18 |
Thu 10/4/18 |
23 |
|
5 |
System Implementation |
18 days |
Fri 10/5/18 |
Tue 10/30/18 |
Materials[1], Equipments[1] |
|
5.1 |
Implementation of plan |
3 days |
Fri 10/5/18 |
Tue 10/9/18 |
24 |
Contractor |
5.2 |
Infrastructure is developed |
7 days |
Wed 10/10/18 |
Thu 10/18/18 |
26 |
Contractor |
5.3 |
System Formation |
5 days |
Fri 10/19/18 |
Thu 10/25/18 |
27 |
Engineer |
5.4 |
Inspection |
3 days |
Fri 10/26/18 |
Tue 10/30/18 |
28 |
Client |
5.5 |
Implemented |
0 days |
Tue 10/30/18 |
Tue 10/30/18 |
29 |
|
6 |
Closure |
5 days |
Wed 10/31/18 |
Tue 11/6/18 |
||
6.1 |
Final reports |
3 days |
Wed 10/31/18 |
Fri 11/2/18 |
30 |
Documenter, Documents[1] |
6.2 |
Submission of reports |
1 day |
Mon 11/5/18 |
Mon 11/5/18 |
32 |
Documenter |
6.3 |
Review and Sign off |
1 day |
Tue 11/6/18 |
Tue 11/6/18 |
33 |
Project Manager |
6.4 |
Project Closed |
0 days |
Tue 11/6/18 |
Tue 11/6/18 |
34 |
The work breakdown structure for the project of CRM implementation for retail organization is given below,
The scope baseline for the project would be set as on date 30/09/2018 and the amount of work completed are given below,
WBS |
Task Name |
% Work Complete |
Duration |
Start |
Finish |
0 |
CRM implementation for retail organization |
61% |
70 days |
Wed 8/1/18 |
Tue 11/6/18 |
1 |
Initialization |
100% |
7 days |
Wed 8/1/18 |
Thu 8/9/18 |
1.1 |
Requirement Analysis |
100% |
2 days |
Wed 8/1/18 |
Thu 8/2/18 |
1.2 |
Documentation |
100% |
3 days |
Fri 8/3/18 |
Tue 8/7/18 |
1.3 |
Submission of Documents |
100% |
1 day |
Wed 8/8/18 |
Wed 8/8/18 |
1.4 |
Review and Sign off |
100% |
1 day |
Thu 8/9/18 |
Thu 8/9/18 |
1.5 |
Kick off |
100% |
0 days |
Thu 8/9/18 |
Thu 8/9/18 |
2 |
Planning |
100% |
10 days |
Fri 8/10/18 |
Thu 8/23/18 |
2.1 |
Plan outline |
100% |
3 days |
Fri 8/10/18 |
Tue 8/14/18 |
2.2 |
Review of Plan |
100% |
2 days |
Wed 8/15/18 |
Thu 8/16/18 |
2.3 |
Complete Plan Formation |
100% |
5 days |
Fri 8/17/18 |
Thu 8/23/18 |
2.4 |
Plan Approval |
100% |
0 days |
Thu 8/23/18 |
Thu 8/23/18 |
3 |
Designing |
100% |
11 days |
Fri 8/24/18 |
Fri 9/7/18 |
3.1 |
Design Platform is selected |
100% |
1 day |
Fri 8/24/18 |
Fri 8/24/18 |
3.2 |
Design Outline is developed |
100% |
3 days |
Mon 8/27/18 |
Wed 8/29/18 |
3.3 |
Review of Design |
100% |
2 days |
Thu 8/30/18 |
Fri 8/31/18 |
3.4 |
Complete Design is developed |
100% |
5 days |
Mon 9/3/18 |
Fri 9/7/18 |
3.5 |
Design Approval |
100% |
0 days |
Fri 9/7/18 |
Fri 9/7/18 |
4 |
System Formation |
79% |
19 days |
Mon 9/10/18 |
Thu 10/4/18 |
4.1 |
Design integration |
100% |
3 days |
Mon 9/10/18 |
Wed 9/12/18 |
4.2 |
UI formation |
100% |
4 days |
Thu 9/13/18 |
Tue 9/18/18 |
4.3 |
Functions Formation |
100% |
3 days |
Wed 9/19/18 |
Fri 9/21/18 |
4.4 |
Programming Formation |
100% |
5 days |
Mon 9/24/18 |
Fri 9/28/18 |
4.5 |
System Formation |
0% |
4 days |
Mon 10/1/18 |
Thu 10/4/18 |
4.6 |
Formation |
0% |
0 days |
Thu 10/4/18 |
Thu 10/4/18 |
5 |
System Implementation |
0% |
18 days |
Fri 10/5/18 |
Tue 10/30/18 |
5.1 |
Implementation of plan |
0% |
3 days |
Fri 10/5/18 |
Tue 10/9/18 |
5.2 |
Infrastructure is developed |
0% |
7 days |
Wed 10/10/18 |
Thu 10/18/18 |
5.3 |
System Formation |
0% |
5 days |
Fri 10/19/18 |
Thu 10/25/18 |
5.4 |
Inspection |
0% |
3 days |
Fri 10/26/18 |
Tue 10/30/18 |
5.5 |
Implemented |
0% |
0 days |
Tue 10/30/18 |
Tue 10/30/18 |
6 |
Closure |
0% |
5 days |
Wed 10/31/18 |
Tue 11/6/18 |
6.1 |
Final reports |
0% |
3 days |
Wed 10/31/18 |
Fri 11/2/18 |
6.2 |
Submission of reports |
0% |
1 day |
Mon 11/5/18 |
Mon 11/5/18 |
6.3 |
Review and Sign off |
0% |
1 day |
Tue 11/6/18 |
Tue 11/6/18 |
6.4 |
Project Closed |
0% |
0 days |
Tue 11/6/18 |
Tue 11/6/18 |
The highlighted activities has been completed successfully and rest of the activities has not been started though.
Conclusion
The influence of effective project planning had been largely formed to be growing and developing the effective formation of the tools and factors. The formation had also be helpful for forming the utilization of the project management tools and factors. The project management tools and factors had been helpful for easing the utilization of the improved tools and aligning the synthesis for the formation of improved activities. The implication of the factors of the formation had been helpful for the analysis of the improved communication and formation. The following assignment was a project planning document developed for the project of CRM implementation for retail organization and it had allow the use of various techniques and tools for the formation of the project. The CRM implementation had been eased by the use of the proper documentation and formation of the factors. It had also been helpful for easing the flow of the information in a synthetic plan formation process. The significant formation of the activities was helpful for forming the synthesis of the technology innovation and formation of the activities.
References
Corner, I. and Hinton, M., 2015. Implementation dynamics for CRM system formation.
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management. Project Management Institute.
Harris, J.L., Roussel, L., Thomas, P.L. and Dearman, C. eds., 2015. Project Planning & Management: A Guide for Nurses and Interprofessional Teams. Jones & Bartlett Publishers.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach. Routledge.
Heagney, J., 2016. Fundamentals of project management. Amacom.
Heravi, A., Coffey, V. and Trigunarsyah, B., 2015. Evaluating the level of stakeholder involvement during the project planning processes of building projects. International Journal of Project Management, 33(5), pp.985-997.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley & Sons.
Kumar, S. and Srivastava, M., 2016. A Critical Review On Perception & Benefits Of Customer Relationship Management (CRM) System In Indian Private Hospitals. Adhyayan, p.21.
Marchewka, J.T., 2014. Information technology project management. John Wiley & Sons.
Mason, P., 2015. Tourism impacts, planning and management. Routledge.
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and technology. Routledge.
Papke-Shields, K.E. and Boyer-Wright, K.M., 2017. Strategic planning characteristics applied to project management. International Journal of Project Management, 35(2), pp.169-179.
Pedron, C.D., Picoto, W.N., Colaco, M. and Araújo, C.C., 2018. CRM System: the Role of Dynamic Capabilities in creating Innovation Capability. Brazilian Business Review.
Reicher, R., Komáromi, N. and Szeghegyi, Á., 2015. The possible success factors of introduction of CRM system at hungarian SMEs. Acta Polytechnica Hungarica, 12(8), pp.215-229.
Rieger, J.P., Stanley, J. and Traynor, R., 2014. Project planning and management for ecological restoration (pp. 7-11). Washington, DC: Island Press.
Sharp, J.A., Peters, J. and Howard, K., 2017. The management of a student research project. Routledge.
Turner, J.R., 2014. Handbook of project-based management(Vol. 92). New York, NY: McGraw-hill.
Verzuh, E., 2015. The fast forward MBA in project management. John Wiley & Sons.
White, J.C. and Sholtes, R.M., 2016. The Dynamic Progress Method: Using Advanced Simulation to Improve Project Planning and Management. CRC Press.
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download