In order to resolve the issues of traditional data management Swaggies has developed new EDI software for interchanging the confidential information without any kind of error. The overall time and budget needed for the development of EDI system, proper time, key stakeholder and communication plan is required to be adopted by the project executive of the company. In order to install the EDI software for the company, the necessary steps those are needed to be followed are as follows:
In order to accomplish the project successfully, different strategies are required to be adopted. For this particular project the strategies those have been undertaken are as follows:
Accurate project planning: In this phase the project manager should ensure the total budget and time needed to successfully complete the project. With the help of project feasibility study the manager will get to know about the total expenditure and investment needed to be done for the successful implementation of the project. Not only this but also, the other elements those are adopted by the project manager include project objective, scope, assumptions, risk management, approaches and duration as well.
Project work-plan: In this phase the project planning that has been done, are outlined in such way so that project definition can be prepared. In order to manage the project accurately the project manager should provide a work plan to the project manager with step by step instruction. An accurate Work Breakdown Structure (WBS) and Network Diagram (ND) are also developed for creating planning horizon.
Comparison between different EDI software systems: In the initiation phase Swaggies has traditional data management system which is not that much compatible according to the business and project requirements. In order to enhance the level of consumer services for the clients different available EDI systems are compared by the project manager. It is found that with the help of the comparison resultant the effectiveness and efficiency of the system can be measured. In order to gain competitive advantages and high level economic success installation of accurate EDIS software is very much necessary.
In order to accomplish the project both human and physical resources are necessary to be adopted by the project manager. For this particular project the required resources are as follows:
Human resource |
Project sponsor |
Project administrator |
|
Technical team member |
|
Quality assurance tem member |
|
Finance team member |
|
Physical resource |
Equipments |
Facility |
|
Expenditure and total funding |
|
Equipments |
Gantt chart
WBS |
Task Name |
Duration |
Start |
Finish |
Predecessors |
Resource Names |
Cost |
0 |
Schedule for EDI software adoption |
131 days |
Sat 9/1/18 |
Fri 3/1/19 |
$93,682.00 |
||
1 |
Project initiation phase |
56 days |
Sat 9/1/18 |
Fri 11/16/18 |
$51,942.00 |
||
1.1 |
Preparing project proposal |
5 days |
Sat 9/1/18 |
Thu 9/6/18 |
Project manager ,software [1],others [1] |
$3,402.00 |
|
1.2 |
Project proposal for approval |
10 days |
Fri 9/7/18 |
Thu 9/20/18 |
2 |
quality assurance team ,hardware[1],software [1],technical team |
$9,002.00 |
1.3 |
Project team formation and meeting plan development |
15 days |
Fri 9/21/18 |
Thu 10/11/18 |
3 |
Project manager ,technical team ,software [1] |
$16,912.00 |
1.4 |
Software purchase |
9 days |
Fri 9/21/18 |
Wed 10/3/18 |
3 |
finance team ,project sponsor, software [1] |
$7,312.00 |
1.5 |
Research on required hardware |
9 days |
Fri 10/12/18 |
Wed 10/24/18 |
4,5 |
project sponsor, quality assurance team ,others [1] |
$8,010.00 |
1.6 |
Meeting with IT company and development of discussion plan |
8 days |
Thu 10/25/18 |
Mon 11/5/18 |
6,5 |
others [1],technical team ,hardware[1],software [1] |
$4,132.00 |
1.7 |
Project budget planning |
9 days |
Tue 11/6/18 |
Fri 11/16/18 |
7 |
finance team ,hardware[1],software [1],others [1] |
$3,172.00 |
2 |
Milestone 1: Completion of project initiation phase |
0 days |
Fri 11/16/18 |
Fri 11/16/18 |
8 |
others [0] |
$0.00 |
3 |
Project planning phase |
43 days |
Mon 11/19/18 |
Wed 1/16/19 |
$25,412.00 |
||
3.1 |
Installation of networking throughout warehouse department |
6 days |
Mon 11/19/18 |
Mon 11/26/18 |
9 |
Project manager ,project sponsor |
$6,720.00 |
3.2 |
Software fixing and hardware problem identification |
15 days |
Tue 11/27/18 |
Mon 12/17/18 |
11 |
technical team |
$7,200.00 |
3.3 |
Removing old system and installing new system |
12 days |
Tue 12/18/18 |
Wed 1/2/19 |
11,12 |
quality assurance team ,hardware[1],others [1],software [1] |
$5,092.00 |
3.4 |
Meeting with stakeholders |
10 days |
Thu 1/3/19 |
Wed 1/16/19 |
13,11 |
Project manager |
$6,400.00 |
4 |
Milestone 2: Completion of project planning phase |
0 days |
Wed 1/16/19 |
Wed 1/16/19 |
14 |
Project manager |
$0.00 |
5 |
Project execution phase |
23 days |
Thu 1/17/19 |
Mon 2/18/19 |
$12,676.00 |
||
5.1 |
Comparison between EDI system |
5 days |
Thu 1/17/19 |
Wed 1/23/19 |
15 |
technical team ,others [1],software [1] |
$2,602.00 |
5.2 |
project outline execution |
4 days |
Thu 1/24/19 |
Tue 1/29/19 |
17 |
Project manager ,project sponsor |
$4,480.00 |
5.3 |
prototype unit testing |
2 days |
Wed 1/30/19 |
Thu 1/31/19 |
18 |
technical team ,software [1] |
$1,072.00 |
5.4 |
prototype integrated testing |
3 days |
Fri 2/1/19 |
Tue 2/5/19 |
19 |
technical team ,others [1] |
$1,530.00 |
5.5 |
Affordability testing of EDI system |
9 days |
Wed 2/6/19 |
Mon 2/18/19 |
20 |
finance team ,software [1] |
$2,992.00 |
6 |
Milestone 3: Completion of project execution phase |
0 days |
Mon 2/18/19 |
Mon 2/18/19 |
21 |
Project manager |
$0.00 |
7 |
Project closure phase |
9 days |
Tue 2/19/19 |
Fri 3/1/19 |
$3,652.00 |
||
7.1 |
Stakeholder signoff |
3 days |
Tue 2/19/19 |
Thu 2/21/19 |
22 |
project sponsor |
$1,440.00 |
7.2 |
Project documentation |
3 days |
Fri 2/22/19 |
Tue 2/26/19 |
24 |
Project manager ,others [1],software [1] |
$2,122.00 |
7.3 |
Post project maintenance plan |
3 days |
Wed 2/27/19 |
Fri 3/1/19 |
24,25 |
others [1] |
$90.00 |
8 |
Milestone 4: Completion of project closure phase |
0 days |
Fri 3/1/19 |
Fri 3/1/19 |
26 |
Project manager |
$0.00 |
9 |
Milestone 1: Completion of project initiation phase |
0 days |
Fri 11/16/18 |
Fri 11/16/18 |
8 |
others [0] |
$0.00 |
10 |
Milestone 3: Completion of project planning phase |
0 days |
Wed 1/16/19 |
Wed 1/16/19 |
14 |
Project manager |
$0.00 |
11 |
Milestone 3: Completion of project execution phase |
0 days |
Mon 2/18/19 |
Mon 2/18/19 |
21 |
Project manager |
$0.00 |
12 |
Milestone 4: Completion of project closure phase |
0 days |
Fri 3/1/19 |
Fri 3/1/19 |
26 |
Project manager |
$0.00 |
Development of communication plan
Purpose |
Report to |
Frequency |
Medium |
Time duration |
Discussion between the project administrator and project team members about the details of software |
Project administrator |
Weekly |
Face to face meeting., email and PPPT |
2 hours |
QA team will be reporting to the project manager about the project quality that has to be implemented |
Project manager |
Daily |
Face to face meeting, PPT and emails |
1 hour |
Technical team members will make discussion about the software details and its implementation plan |
Project manager |
Daily |
Meeting, conferences and PPT, email |
2 hour |
Project administrator provided the details of EDI software their features and other requirements accurately in the organized meeting |
General manager |
Weekly |
Meeting, PPT, conferences |
1 hour |
Detailed budget plan
WBS |
Task Name |
Resource Names |
Cost |
0 |
Schedule for EDI software adoption |
$93,682.00 |
|
1 |
Project initiation phase |
$51,942.00 |
|
1.1 |
Preparing project proposal |
Project manager ,software [1],others [1] |
$3,402.00 |
1.2 |
Project proposal for approval |
quality assurance team ,hardware[1],software [1],technical team |
$9,002.00 |
1.3 |
Project team formation and meeting plan development |
Project manager ,technical team ,software [1] |
$16,912.00 |
1.4 |
Software purchase |
finance team ,project sponsor, software [1] |
$7,312.00 |
1.5 |
Research on required hardware |
project sponsor, quality assurance team ,others [1] |
$8,010.00 |
1.6 |
Meeting with IT company and development of discussion plan |
others [1],technical team ,hardware[1],software [1] |
$4,132.00 |
1.7 |
Project budget planning |
finance team ,hardware[1],software [1],others [1] |
$3,172.00 |
2 |
Milestone 1: Completion of project initiation phase |
others [0] |
$0.00 |
3 |
Project planning phase |
$25,412.00 |
|
3.1 |
Installation of networking throughout warehouse department |
Project manager ,project sponsor |
$6,720.00 |
3.2 |
Software fixing and hardware problem identification |
technical team |
$7,200.00 |
3.3 |
Removing old system and installing new system |
quality assurance team ,hardware[1],others [1],software [1] |
$5,092.00 |
3.4 |
Meeting with stakeholders |
Project manager |
$6,400.00 |
4 |
Milestone 2: Completion of project planning phase |
Project manager |
$0.00 |
5 |
Project execution phase |
$12,676.00 |
|
5.1 |
Comparison between EDI system |
technical team ,others [1],software [1] |
$2,602.00 |
5.2 |
project outline execution |
Project manager ,project sponsor |
$4,480.00 |
5.3 |
prototype unit testing |
technical team ,software [1] |
$1,072.00 |
5.4 |
prototype integrated testing |
technical team ,others [1] |
$1,530.00 |
5.5 |
Affordability testing of EDI system |
finance team ,software [1] |
$2,992.00 |
6 |
Milestone 3: Completion of project execution phase |
Project manager |
$0.00 |
7 |
Project closure phase |
$3,652.00 |
|
7.1 |
Stakeholder signoff |
project sponsor |
$1,440.00 |
7.2 |
Project documentation |
Project manager ,others [1],software [1] |
$2,122.00 |
7.3 |
Post project maintenance plan |
others [1] |
$90.00 |
8 |
Milestone 4: Completion of project closure phase |
Project manager |
$0.00 |
9 |
Milestone 1: Completion of project initiation phase |
others [0] |
$0.00 |
10 |
Milestone 3: Completion of project planning phase |
Project manager |
$0.00 |
11 |
Milestone 3: Completion of project execution phase |
Project manager |
$0.00 |
12 |
Milestone 4: Completion of project closure phase |
Project manager |
$0.00 |
Training and development program: In order to make the project manager familiar to the project details, proper training and development program is needed to be arranged by the project manager for the project team members. It is expected that with the help of the organized training program, the project team member will get to know more about the project requirements and project goal.
Development of encryption program: In order to mitigate the issues of data loss it is necessary for the project manager to implement proper security aspects in terms of encryption, firewall and string password. While transferring data, it is necessary for the project manager to keep it within the boundary to avoid data hijacking. In order to maintain data security proper encryption algorithm is required to be adopted.
Risk transfer strategy: For mitigating the risks fours different strategies are there those are required to be adopted such as accept the risk, avoid the risk, transfer the risk and exploit the risk. However, among these four aspects based on the requirement and project goal proper risk mitigation strategy is needed to be adopted by the project manager and project team members.
Software and hardware testing: In order to ensure that, all the adopted hardware and software are accurate for the EDI system. It is necessary for the project manager to go through both unit and integrated hardware and software testing session. It will help the project manager and project team member about the necessary additional components those should be adopted to get successful revenue.
The reached milestones those have been recorded in the Gant chart are as follows:
Task Name |
Duration |
Start |
Finish |
Resource Names |
Milestone 1: Completion of project initiation phase |
0 days |
Fri 11/16/18 |
Fri 11/16/18 |
others [0] |
Milestone 3: Completion of project planning phase |
0 days |
Wed 1/16/19 |
Wed 1/16/19 |
Project manager |
Milestone 3: Completion of project execution phase |
0 days |
Mon 2/18/19 |
Mon 2/18/19 |
Project manager |
Milestone 4: Completion of project closure phase |
0 days |
Fri 3/1/19 |
Fri 3/1/19 |
Project manager |
Actual Vs Budget expenditure to date
Task Name |
Duration |
Start |
Finish |
Cost |
Actual Cost |
% Work Complete |
Schedule for EDI software adoption |
131 days |
Sat 9/1/18 |
Fri 3/1/19 |
$93,682.00 |
$52,084.19 |
56% |
Milestone 1: Completion of project initiation phase |
0 days |
Fri 11/16/18 |
Fri 11/16/18 |
$0.00 |
$0.00 |
0% |
Milestone 2: Completion of project planning phase |
0 days |
Wed 1/16/19 |
Wed 1/16/19 |
$0.00 |
$0.00 |
0% |
Milestone 3: Completion of project execution phase |
0 days |
Mon 2/18/19 |
Mon 2/18/19 |
$0.00 |
$0.00 |
0% |
Milestone 1: Completion of project initiation phase |
0 days |
Fri 11/16/18 |
Fri 11/16/18 |
$0.00 |
$0.00 |
0% |
Milestone 3: Completion of project planning phase |
0 days |
Wed 1/16/19 |
Wed 1/16/19 |
$0.00 |
$0.00 |
0% |
Milestone 3: Completion of project execution phase |
0 days |
Mon 2/18/19 |
Mon 2/18/19 |
$0.00 |
$0.00 |
0% |
Milestone 4: Completion of project closure phase |
0 days |
Fri 3/1/19 |
Fri 3/1/19 |
$0.00 |
$0.00 |
0% |
Milestone 4: Completion of project closure phase |
0 days |
Fri 3/1/19 |
Fri 3/1/19 |
$0.00 |
$0.00 |
20% |
Project closure phase |
9 days |
Tue 2/19/19 |
Fri 3/1/19 |
$3,652.00 |
$1,061.00 |
25% |
Stakeholder signoff |
3 days |
Tue 2/19/19 |
Thu 2/21/19 |
$1,440.00 |
$0.00 |
0% |
Post project maintenance plan |
3 days |
Wed 2/27/19 |
Fri 3/1/19 |
$90.00 |
$0.00 |
0% |
Project documentation |
3 days |
Fri 2/22/19 |
Tue 2/26/19 |
$2,122.00 |
$1,061.00 |
50% |
Project execution phase |
23 days |
Thu 1/17/19 |
Mon 2/18/19 |
$12,676.00 |
$5,184.39 |
40% |
Comparison between EDI system |
5 days |
Thu 1/17/19 |
Wed 1/23/19 |
$2,602.00 |
$780.60 |
30% |
Affordability testing of EDI system |
9 days |
Wed 2/6/19 |
Mon 2/18/19 |
$2,992.00 |
$897.60 |
30% |
project outline execution |
4 days |
Thu 1/24/19 |
Tue 1/29/19 |
$4,480.00 |
$1,792.00 |
40% |
prototype unit testing |
2 days |
Wed 1/30/19 |
Thu 1/31/19 |
$1,072.00 |
$643.20 |
60% |
prototype integrated testing |
3 days |
Fri 2/1/19 |
Tue 2/5/19 |
$1,530.00 |
$1,070.99 |
70% |
Project planning phase |
43 days |
Mon 11/19/18 |
Wed 1/16/19 |
$25,412.00 |
$12,543.20 |
50% |
Installation of networking throughout warehouse department |
6 days |
Mon 11/19/18 |
Mon 11/26/18 |
$6,720.00 |
$2,688.00 |
40% |
Software fixing and hardware problem identification |
15 days |
Tue 11/27/18 |
Mon 12/17/18 |
$7,200.00 |
$3,600.00 |
50% |
Meeting with stakeholders |
10 days |
Thu 1/3/19 |
Wed 1/16/19 |
$6,400.00 |
$3,200.00 |
50% |
Removing old system and installing new system |
12 days |
Tue 12/18/18 |
Wed 1/2/19 |
$5,092.00 |
$3,055.20 |
60% |
Project initiation phase |
56 days |
Sat 9/1/18 |
Fri 11/16/18 |
$51,942.00 |
$33,295.60 |
64% |
Project proposal for approval |
10 days |
Fri 9/7/18 |
Thu 9/20/18 |
$9,002.00 |
$4,501.00 |
50% |
Meeting with IT company and development of discussion plan |
8 days |
Thu 10/25/18 |
Mon 11/5/18 |
$4,132.00 |
$2,066.00 |
50% |
Preparing project proposal |
5 days |
Sat 9/1/18 |
Thu 9/6/18 |
$3,402.00 |
$2,041.20 |
60% |
Software purchase |
9 days |
Fri 9/21/18 |
Wed 10/3/18 |
$7,312.00 |
$4,387.20 |
60% |
Project team formation and meeting plan development |
15 days |
Fri 9/21/18 |
Thu 10/11/18 |
$16,912.00 |
$11,838.40 |
70% |
Research on required hardware |
9 days |
Fri 10/12/18 |
Wed 10/24/18 |
$8,010.00 |
$5,607.00 |
70% |
Project budget planning |
9 days |
Tue 11/6/18 |
Fri 11/16/18 |
$3,172.00 |
$2,854.80 |
90% |
Different reasons are defined for which the project manager has to undertake different action plan. In order to accomplish the project the project managers are require to make certain action plan in the project initiation phase and even after the execution of the project. For this particular project an action plan that has been undertaken is as follows:
On the other hand, there are certain reasons for which during the implementation of the EDI software in Swaggies the project head to take the action plan. The respective reasons for the action plans are as follows:
After the identification of the reasons for which the project manager has undertaken certain action plan, the executives have developed an advanced communication plan. It is expected that with the help of this accurate action plan the stakeholders and the project manager will be able to understand about the project goal objectives properly. The purpose of communication and the set of topic those have been discussed in these meetings are as follows:
The aim of the project is to install and implement Electronic Data Interchange (EDI) software for Swaggies. The warehouse department of Swaggies does not have proper managerial aspects and due to this reason the company was continuously failing to meet the requirements. In order to resolve this issue, they have thought of installing advanced software to improve their existing customer service. It is expected that with the successful implementation of the project, the company will be able to gain a team of professionally trained staffs. Swaggies will also get economic support and with the time management the rate of staff efficiency will also increase accordingly. In addition to this, Swaggies can gain competitive advantages from the market place with an enhanced customer service management system.
The problems those have been identified by the project manager during the existing data warehouse application are as follows:
This is one of the most vital parts in project management that helps the project manager to ensure about the project requirements and current status of the project as well. Based on the requirement of the project it has been found that, 6 months are needed to complete the project however, after 3 months the status of the project is also defines that total 60% as to be completed.
From the detail study of the project it has been learned that only identification of the resources are not enough rather after that both the human resources and physical resources should be analyzed. In addition to this, before initiating the project the feasibility study must be done accordingly so that the project manager get to know about the total expenditure to be achieved. Apart from this, during the project development phase, appropriate time to time progress report is also needed to be developed.
If all the identified steps are maintained accurately then, it can be assumed that the project manager will be able to meet the requirements accordingly. The identified risks will be minimized, the productivity of Swaggies will increase and the other features that the company would be able to get include the following:
References
Bresnen, M., 2016. Institutional development, divergence and change in the discipline of project management. International journal of project management, 34(2), pp.328-338.
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management. Project Management Institute.
Guo, F., Chang-Richards, Y., Wilkinson, S. and Li, T.C., 2014. Effects of project governance structures on the management of risks in major infrastructure projects: A comparative analysis. International Journal of Project Management, 32(5), pp.815-826.
Heldman, K., 2015. PMP project management professional exam deluxe study guide: updated for the 2015 Exam. John Wiley & Sons.
Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. John Wiley & Sons.
Leach, L.P., 2014. Critical chain project management. Artech House.
Lock, M.D., 2014. The essentials of project management. Ashgate Publishing, Ltd.. Lock, M.D., 2014. The essentials of project management. Ashgate Publishing, Ltd..
Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and techniques for the practicing project manager. John Wiley & Sons.
Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success. International journal of project management, 32(2), pp.202-217.
Nelson, R.R. and Morris, M.G., 2014. IT Project Estimation: Contemporary Practices and Management Guidelines. MIS Quarterly Executive, 13(1).
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Snyder, C.S., 2014. A Guide to the Project Management Body of Knowledge: PMBOK (®) Guide. Project Management Institute.
Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), pp.278-290.
Todorovic, M.L., Petrovic, D.?., Mihic, M.M., Obradovic, V.L. and Bushuyev, S.D., 2015. Project success analysis framework: A knowledge-based approach in project management. International Journal of Project Management, 33(4), pp.772-783.
Too, E.G. and Weaver, P., 2014. The management of project management: A conceptual framework for project governance. International Journal of Project Management, 32(8), pp.1382-1394.
Verzuh, E., 2015. The fast forward MBA in project management. John Wiley & Sons.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Weiss, J., Newell, S. and Swan, J., 2017, January. Introduction to IT and project management minitrack. In Proceedings of the 50th Hawaii International Conference on System Sciences.
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download