1. Develop a set of relevant and achievable goals appropriate for the project described in the Case Study. How your goals will be measured as the project progresses.
Being the project manager, the responsibility is to bring the Western Australian (WA) oil storage facility up to the standard and in order to achieve this, a number of goals need to be ascertained and mandated throughout the company. The statistics of the project and the site shows that almost 30% of the company’s unloaded storage capacity in at the verge of getting collapsed.
Goal 1: The project engineer needs to monitor the storage tanks and implement renovation policies immediately
Goal 2: The Company needs to employ new policies by which environmental leakage can be reduced to the least possible extent
Goal 3: The Company need to reconsider the loading of oil tanks by removable vehicles and need to implement construction of underground pipelines by which the oil can be loaded on to the tanks which will eventually eliminate the risk of any accidents
The three distinctive goals can be measured and monitored as and when the implication of every respective goal get sanctioned and carried forward and after the mitigation of every loophole, it can be administered that the respective goal has been achieved. The company needs to monitor the progress of the works being undertaken in accordance to the goals and the progress needs to be relayed to the project management office periodically.
2. Write a brief scope statement for the Case Study project.
The objective of this project is to renovate the age-old WA petroleum storage facility and reduce the environmental deficit to the least possible extent. The Leadership in Energy and Environmental Design (LEED) certification needs to be administered as well in West Australia. Since the already established petroleum tank is almost 50 years old and have been suffering a dilapidated condition since quite some time, the project management office has sanctioned the renovation protocols and policies since the company is shelving out almost $20,000 AUS per month as environment fines and penalties just because of the fact that the oil spills have been occurring for a prolonged time span. This is the reason the project manager has proposed a renovation program alongside the construction of an underground tunnelling and pipeline system from the non-inhabitable area from where the oil will be transferred to the main tanks. As far as the entire renovation and pipeline installation are concerned, the initial top-down estimate provided for a budget not exceeding $1,000,000 AUS.
Additionally, the entire establishment of the renovation and the new construction would be done by following the norms of the environmental ethics of the country and also by taking legal permissions from both local and nationalised governments. A proposal would also be delivered to the government for funding the project partially.
The installation and the construction work need to implement at least 50% of the renewable energy sources which would account for at least 2000 KWH per month from a Grid tile roof top solar installation. This would be incorporated with Micro-grid AC coupling upgraded to full energy independency such as wind generation with addition benefit to the environment. The accessibility of the road or the passageway should be made to all the three tanks instead of tank 3 alone and the retaining walls in case of tanks 1 and 2 should be made thicker and consistent.
3. Provide an overview of the Case Study project’s overall process, life cycle or methodology.
The life cycle integrity management and the methodologies implemented in case of oil and natural gas asset are carried out with the sole aim of ensuring the integrity of the asset that needs to be maintained from the very first operation till the decommissioning. The life cycle stages of this project would comprise of the following;
FEED
The pre-feed and the feed stages of the project are those stages that enable the definition of the scope to be represented in a more refined way. This automatically ensures minimization of risk factors associated with the project thereby reducing the project costing as well. This stage depicts the entire project’s objective clearance and transparency and overall feasibility of the project that gets maintained with a cost effective solution. At this initial stage, only the general proposals with respect to integrity control get administered. During the FEED stage, the consideration needs to be given on to procurement of raw materials, legislation, fabrication and tax issues. This stage also fosters a vivid entailment of the full life cost analysis. The integrity related isues that gets governed at this stage are material sectioning, chemical treatment facilities, evaluation and inspection.
The designing stage comprises of two consolidated steps namely design and detailed design. The phases involved in these two stages are as follows;
The construction and commissioning phase of the project will comprise of systems required for the ongoing monitoring and integral sectioning of the project. The construction does not generally occur at a single specified region and on the contrary, most of the constructions are done in a different region individually and then assembled in the final spot. This uses 3-dimensional map during the operational phase. An intelligent information system also gets developed by the addition of key data to the system. The Integrity Management Systems include several documentation phases such as integrity management policy and strategy, sand management strategy, corrosion management manual, hydrotesting and preservation protocols, chemical management strategies, risk-oriented inspection strategy, corrosion evolution manual and inspection protocols.
References
Taresh Ejel, A, & . ., “Impact of Integration Management on Construction Project Management Performance (Oil Refining Company).”. in International Journal of Engineering & Technology, 7, 2018, 40.
Nicholas JM, Steyn H. Project management for engineering, business and technology. Routledge; 2017 Jan 20.
Olaniran OJ. Barriers to tacit knowledge sharing in geographically dispersed project teams in oil and gas projects. Project Management Journal. 2017 Jun;48(3):41-57.
McKettaJr J. Encyclopedia of Chemical Processing and Design: Volume 45-Project Progress Management to Pumps. Routledge; 2017 Nov 22.
Olaniran OJ, Love PE, Edwards D, Olatunji OA, Matthews J. Cost overruns in hydrocarbon megaprojects: A critical review and implications for research. Project Management Journal. 2015 Dec;46(6):126-38.
Takey SM, de Carvalho MM. Competency mapping in project management: An action research study in an engineering company. International Journal of Project Management. 2015 May 1;33(4):784-96.
Antunes R, Gonzalez V. A production model for construction: A theoretical framework. Buildings. 2015 Mar 3;5(1):209-28.
Pasian MB, editor. Designs, methods and practices for research of project management. Gower Publishing, Ltd.; 2015 May 28.
Jo SH, Lee EB, Pyo KY. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process. Sustainability (2071-1050). 2018 Jun 1;10(6).
Rui Z, Li C, Peng F, Ling K, Chen G, Zhou X, Chang H. Development of Industry performance metrics for offshore oil and gas project. Journal of Natural Gas Science and Engineering. 2017 Mar 1;39:44-53.
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download