Risk assessment includes the overall process to identify risk and hazards. And hazard is something that could be dangerous to an individual, to an individual’s health and safety and to the company’s or an individual’s reputation. According to Occupational Safety, and Health (OSH), “hazard is a condition that poses a level of potential risk (Burke, Scheurer & Meredith, 2007).
In the non-building sector, the bridge is the biggest growth segment also the highly impacted in the bridge collapsed (U.S. Bridge, 2018). On the afternoon of December 15, 1967, the Silver Bridge collapsed while handling the load of heavy traffic and killed around 46 people and many others were injured. Around 5’o clock in the evening, the chain on the upriver side suddenly snapped. The roadway started to incline; cars started falling into the river 80 feet below. There was one witness who told to Time magazine, “The Bridge just capsized over, starting slowly on the Ohio side and then folding like a deck of cards to the West Virginia side.” The bridge provided crossing for US route 35 over the Ohio River and connected to Columbus, Charleston, and West Virginia. The bridge was built by the American bridge company of Pittsburgh. According to the National Transportation Safety Board report, “The accident was caused by a fractured eye bar”. The government eventually improved the way bridges were examined to ensure safety and functionality. If the proper risk assessment was implemented then the whole incident was avoidable (Johnston, 2007).
At the time of construction of any infrastructure it is important to keep one thing in mind that can because of harm by exposure to risk, for example, accidents of workers and the general public, damage of property, loss of money on agreements, loss of time, production, reputation, and future business for example, “A properly implemented risk assessment could save the life of 46 people if Silver bridge incident has not happened”. To protect these risks it is important to have a planned descriptive risk assessment and strategies that can easily identify future hazards (KarimiAzari, Mousavi, Mousavi, & Hosseini, 2011).
Cause of failure |
Design Error |
Lack of maintenance |
Deficiency in construction |
Material defect |
Earthquake |
Scour |
Flood |
Collision |
Environmental Degradation |
Overload |
Fire |
Wind |
Source: – Bridge Master (2017)
Risk management
Risk management is the process of identifying the hazards in advance; analyze the risk and taking protective steps to reduce it (The Economic Times, 2018).
Risk management strategy is the process of reviewing the assessment and regularly updates it on the basis of new plans and actions to be taken for the development (The Economic Times, 2018).
This includes the method of techniques and practices of management which is a help in preventing unnecessary risks. It also includes the best practices, quality, best planning methods and forecasting (Modarres, 2016).
Risk assessment, machines inspection, and proper coordination provide proper knowledge and information, workers training regarding their jobs, and safety rounds these are some points which comes under the risk protection or risk prevention. According to OSHA, one out of every four or five workplace deaths is a construction worker (OSHA, 2018). To make the construction business safe occupation workers should be trained and must be aware of the danger. Below are some points that can be implemented for the risk protection strategies (The perecman firm, 2014).
Conclusion
In the conclusion of the above text, risk assessment and its strategies to manage and maintain the hazard are really important, to stabilize the environment and situation at the time of hazard. Risk assessment includes the health and safety features to prevent the people internal (workers) and external (general public). Before starting the construction work proper guidelines related to safety and health should be implemented and the worker must be educated and trained over those guidelines. And if any changes are implementing in the middle which was not mentioned in the requirements then workers should be informed about the same. Workers should be trained and educated for all the tools and equipment that can be used for the construction work. The effective risk assessment must include all the functions and processes and it should be successfully installed in the project to achieve the goal and to gain a clear understanding of the duties and feasibility of the work. If the proper guidelines were implemented then this hazard could be avoided by maintaining and managing the bridge aspects in a timely manner.
A risk and control culture should be experienced by everyone included in the project and the effectiveness of the structural and organizational measures of the risk management. Effective risk assessment includes the commitments and the risk-conscious behavior of every individual. For the success of the project motivation and the interplay of the parties should be involved to determine the quality of the work.
References
Akintoye, A., Beck, M., & Hardcastle, C. (2008). Public-private partnerships: managing risks and opportunities. USA: Blackwell Science
Breeding D.C. (2011). What Is Hazardous? Retrieved from https://ohsonline.com/articles/2011/07/01/what-is-hazardous.aspx
Burger, R. (2015). The ultimate guide to construction risk management. Retrieved from https://blog.capterra.com/the-ultimate-guide-to-construction-risk-management/
Burke, M. J., Scheuer, M. L., & Meredith, R. J. (2007). A dialogical approach to skill development: The case of safety skills. Human Resource Management Review. 17(2), 235-250.
Burnaby, P., & Hass, S. (2009). Ten steps to enterprise-wide risk management. Corporate Governance: The international journal of business in society, 9(5), 539-550.
Cretu, O., Stewart, R., & Berends, T. (2011). Risk management and design and construction. New Jersey: John wiley & sons.
HAS. (2018). Risk Assessment. Retrieved from: https://www.hsa.ie/eng/Publications_and_Forms/Publications/Safety_and_Health_Management/Section%202%20Risk%20Assessment.pdf
Hopkin, P. (2018). Fundamentals of risk management: understanding, evaluating and implementing effective risk management (5th ed.). United States: Kogan Page Publishers.
Johnston, C. (2007). Earlier Disaster Led to Focus on Bridge Safety. Retrieved from https://www.npr.org/templates/story/story.php?storyId=12449979
Jones, K. (2017). Identifying and managing construction project risks. Retrieved from https://www.constructconnect.com/blog/operating-insights/identifying-managing-construction-project-risks/
KarimiAzari, A., Mousavi, N., Mousavi, S. F., & Hosseini, S. (2011). Risk assessment model selection in construction industry. Expert Systems with Applications, 38(8), 9105-9111.
Li, W. (2014). Risk assessment of power systems: models, methods, and applications (2nd ed.). Canada: John wiley & sons.
Modarres, M. (2016). Risk analysis in engineering: techniques, tools, and trends (1st ed.). New York: Taylor & Francis
Nieto-Morote, A., & Ruz-Vila, F. (2011). A fuzzy approach to construction project risk assessment. International Journal of Project Management, 29(2), 220-231.
OSHA. (2016). Workers’ rights. Retrieved from https://www.osha.gov/Publications/osha3021.pdf
OSHA. (2018). Occupational safety and health administration. Retrieved from https://www.osha.gov/news/newsreleases/region4/10232018
Pinto, A., Nunes, I. L., & Ribeiro, R. A. (2011). Occupational risk assessment in construction industry–Overview and reflection. 49(5), 616-624.
Schieg, M. (2010). Risk management in construction project management. Journal of business economics and management. 7(2), 77-83. Retrieved from https://www.tandfonline.com/doi/pdf/10.1080/16111699.2006.9636126
Smith, N. J., Merna, T., & Jobling, P. (2009). Managing risk: in construction projects (2nd ed.). United Kingdom: John wiley & sons.
The Economic Times. (2018). Improve manufacturing quality – and reduce workplace risk. Retrieved from https://economictimes.indiatimes.com/definition/risk-management.
The perecman firm. (2014). How to Prevent an Accident at Construction Site. Retrieved from https://www.perecman.com/blog/2014/may/how-to-prevent-an-accident-at-construction-site/
Tummala, R., & Schoenherr, T. (2011). Assessing and managing risks using the supply chain risk management process (SCRMP). Supply Chain Management: An International Journal, 16(6), 474-483.
S. Bridge. (2018). 2018 bridge industry economic projections. Retrieved from https://usbridge.com/2018-bridge-industry-economic-projections/
Valentic, S. (2018). Managing risk with personal protective equipment. Retrieved from https://www.ehstoday.com/construction/managing-risk-personal-protective-equipment-infographic
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download