The deployment of the improved functional development actor would be aligned for forming the improved functional and effective development model (Snyder 2014). The integration of the operations would be helpful for forming the alignment of the project management principles and technology development on a single platform. The successive deployment of the operations would be helpful for using effective project plan development for the integration and operations. The integration of the activities had formed for the integration of the successive and obsolete development model. The integration of the project management is helpful for forming the alignment of the activities so that expected project outcome attenuation.
The following assignment is a project plan documentation that has considered the effective and emissive development of the project of SAP Business One Implementation for iPics. The deployment of the operations would be helpful for forming the cohesive disintegration of the activities. The project schedule and approach of forming the project has been mentioned in this project that could be helpful for forming the development of the operations. The analysis of the effective and improved project integration would be helpful for the listing the activities in phase divisions for ensuring that the project plan is developed. The risk management, resource division, budget allocation, and communication plan development has been helpful for forming the support of the improved documentation and report.
Aims: The project of SAP Business One Implementation for iPics comprises of developing effective project management activities and aligns them proactively for the formation of the improved reporting. The project aims for utilizing the project management principles and functions for developing effective processes in the organization. The supportive development of the functions would allow the management of information and data on an integrated platform.
Objectives: The objectives of the SAP Business One Implementation for iPics project are,
Deliverables: The project of SAP Business One Implementation for iPics is deployed for forming the development and integration of the activities for the project. The successful and cohesive deployment of the activities would be helpful for integrating the operations of the activities and it would also allow the formation of the operations. The formation of the project comprise of the following deliverables,
Feasible Project Plan-> The development of the feasible project plan is the primary deliverable of the project initiation phase along with the resource allocation, and project expense budget. The measurement process for the feasibility of the project plan includes revenue generation, profit calculation, and NPV analysis.
Acceptable Design-> The design made for SAP business one implementation in iPics would be tested by the help of simulation testing. The design would be simulated for listing the possible issues and compatible design of the system made.
Accurate Implementation Plan-> The implementation plan holds an integrated position in listing out the deployment of the improved functional analysis. The support and development of activities is largely responsible for forming the progress of the business development activities. The system testing of functions and UI can be used for testing.
Appropriate Documentation-> It is important for forming accurate final documents for the project and the alignment of the functions would allow the integration of the successive development of the operations. The documentation process would involve the formation of the improved functional and operational plan for future projects.
The project of SAP Business One Implementation for iPics includes the development of the SAP business one compatible with iPics and implementing them for improving their performances. The project aims for utilizing the project management principles and functions for developing effective processes in the organization. The supportive development of the functions would allow the management of information and data on an integrated platform. The successful and cohesive deployment of the activities would be helpful for integrating the operations of the activities and it would also allow the formation of the operations. The development of the feasible project plan is the primary deliverable of the project initiation phase along with the resource allocation, and project expense budget.
The project scheduling had been done following the traditional waterfall model for development and analysis (Tomanek and Juricek 2015). The deployment of the improved waterfall model had helped in forming the management of the operations and classifying the deployment of the improved functional development. The formation of the improved functional development was resulted due to the formation of the support and development of the operations. The integration of the supportive project development methodology was supported by the principles of project management. The scheduling and planning approach of the PMBOK and Prince2 were used for listing the development of the project activities.
The project schedule comprises of dividing the complete project in 6 work packages namely project initialization, procurement agreement documentation, installation of server and testing, integration of data, testing phase, and training and documentation. Each of the phase comprises of forming an effective and improved list of activities for forming the improved project integration management. The project initialization consists of analysis of requirements, documentation of project charter, project initiation documentation, and documents approval. The procurement agreement documentation consists of agreement with contractor, agreement with quick cables, and order is placed at Frida systems. The installation of server and testing consists of server room is refurnished, cables are laid, cables are installed, server is delivered, server is tested, and server is installed. The integration of data includes conversion of data, data extraction, cleansing of data, data is converted and imported into SAP business one, installation of system, and pos and ecommerce system is integrated. The testing phase includes testing for user interface, black box testing, white box testing, complete system beta test, and documentation of testing results. The training and documentation includes user manuals are developed, training programs are made, training process is delivered, development of final documents, sign off the final documents, and payment is completed. The final activity of the project is its closure or project closed.
The following is the schedule for the project of SAP Business One Implementation for iPics,
WBS |
Task Name |
Duration |
Start |
Finish |
0 |
SAP Business One Implementation for iPics |
81 days |
Mon 7/23/18 |
Mon 11/12/18 |
1 |
Project Initialization |
9 days |
Mon 7/23/18 |
Thu 8/2/18 |
1.1 |
Analysis of requirements |
2 days |
Mon 7/23/18 |
Tue 7/24/18 |
1.2 |
Documentation of Project Charter |
3 days |
Wed 7/25/18 |
Fri 7/27/18 |
1.3 |
Project Initiation Documentation |
3 days |
Mon 7/30/18 |
Wed 8/1/18 |
1.4 |
Documents Approval |
1 day |
Thu 8/2/18 |
Thu 8/2/18 |
2 |
Procurement Agreement Documentation |
3 days |
Mon 8/6/18 |
Wed 8/8/18 |
2.1 |
Agreement with contractor |
1 day |
Mon 8/6/18 |
Mon 8/6/18 |
2.2 |
Agreement with Quick Cables |
1 day |
Tue 8/7/18 |
Tue 8/7/18 |
2.3 |
Order is placed at Frida Systems |
1 day |
Wed 8/8/18 |
Wed 8/8/18 |
3 |
Installation of Server and Testing |
9.25 days |
Thu 8/9/18 |
Wed 8/22/18 |
3.1 |
Server room is refurnished |
4 days |
Thu 8/9/18 |
Tue 8/14/18 |
3.2 |
Cables are laid |
2 hrs |
Thu 8/16/18 |
Thu 8/16/18 |
3.3 |
Cables are installed |
4 days |
Thu 8/16/18 |
Wed 8/22/18 |
3.4 |
Server is delivered |
3 hrs |
Wed 8/15/18 |
Wed 8/15/18 |
3.5 |
Server is tested |
2 days |
Wed 8/15/18 |
Fri 8/17/18 |
3.6 |
Server is installed |
5 hrs |
Fri 8/17/18 |
Fri 8/17/18 |
4 |
Integration of data |
38 days |
Mon 8/20/18 |
Wed 10/10/18 |
4.1 |
Conversion of data |
5 days |
Mon 8/20/18 |
Fri 8/24/18 |
4.2 |
Data Extraction |
5 days |
Mon 8/27/18 |
Fri 8/31/18 |
4.3 |
Cleansing of data |
5 days |
Mon 9/3/18 |
Fri 9/7/18 |
4.4 |
Data is converted and imported into SAP business one |
10 days |
Thu 9/27/18 |
Wed 10/10/18 |
4.5 |
Installation of system |
3 days |
Mon 9/10/18 |
Wed 9/12/18 |
4.6 |
POS and ecommerce system is integrated |
10 days |
Thu 9/13/18 |
Wed 9/26/18 |
5 |
Testing Phase |
11 days |
Thu 10/11/18 |
Thu 10/25/18 |
5.1 |
Testing for user interface |
2 days |
Thu 10/11/18 |
Fri 10/12/18 |
5.2 |
Black box testing |
2 days |
Mon 10/15/18 |
Tue 10/16/18 |
5.3 |
White Box testing |
2 days |
Wed 10/17/18 |
Thu 10/18/18 |
5.4 |
Complete System Beta Test |
3 days |
Fri 10/19/18 |
Tue 10/23/18 |
5.5 |
Documentation of testing results |
2 days |
Wed 10/24/18 |
Thu 10/25/18 |
6 |
Training and Documentation |
12 days |
Fri 10/26/18 |
Mon 11/12/18 |
6.1 |
User Manuals are developed |
3 days |
Fri 10/26/18 |
Tue 10/30/18 |
6.2 |
Training programs are made |
2 days |
Wed 10/31/18 |
Thu 11/1/18 |
6.3 |
Training Process is delivered |
2 days |
Fri 11/2/18 |
Mon 11/5/18 |
6.4 |
Development of final documents |
3 days |
Tue 11/6/18 |
Thu 11/8/18 |
6.5 |
Sign off the final documents |
1 day |
Fri 11/9/18 |
Fri 11/9/18 |
6.6 |
Payment is completed |
1 day |
Mon 11/12/18 |
Mon 11/12/18 |
7 |
Project Closed |
0 days |
Mon 11/12/18 |
Mon 11/12/18 |
The resources of the project of SAP Business One Implementation for iPics consist of a number of human, external contractor, and material resources. These resources are required for forming the accurate and effective development of the project activities.
Human Resources of the project: Client, Project Manager, Trainer, Database Programmer, Business Analyst, Data Entry Officer, Technical Officer, Administrative Officer, and Tester.
External Contractors: Contractor (Goran), System Integrator (Shane), Technical Writer, Quick Cables, and Frida Systems.
Material Resources: Cables, Hardware and Software, Cables Installation, Delivery of Server, Platinum Server, and Construction Material. The resource usage of the project is given below,
Resource Name |
Used for |
Client |
Documents Approval Sign off the final documents Payment is completed |
Contractor (Goran) |
Agreement with contractor Server room is refurnished |
Quick Cables |
Agreement with Quick Cables Cables are laid Cables are installed |
Frida Systems |
Server is delivered Server is installed |
Project Manager |
Agreement with contractor Agreement with Quick Cables Order is placed at Frida Systems Server room is refurnished Complete System Beta Test Sign off the final documents Payment is completed |
Database Programmer |
Conversion of data Data Extraction Cleansing of data |
Data Entry Officer |
Data is converted and imported into SAP business one System Integrator (Shane) POS and ecommerce system is integrated |
Technical Writer |
User Manuals are developed Development of final documents |
Trainer |
Training programs are made Training Process is delivered |
Business Analyst |
Analysis of requirements |
Technical Officer |
Server is tested Installation of system |
Administrative Officer |
Documentation of Project Charter Project Initiation Documentation |
Cables |
Cables are laid |
Cables Installation |
Cables are installed |
Hardware and Software |
Installation of system |
Platinum Server |
Server is delivered |
Delivery of Server |
Server is delivered |
Construction Material |
Server room is refurnished |
Tester |
Testing for user interface Black box testing White Box testing Complete System Beta Test Documentation of testing results |
The RACI matrix for the project of SAP Business One Implementation for iPics is given below,
Activities Resource Name |
Requirement Analysis |
Development of Documents |
Contract Procurement |
Construction Activities |
Installation of Cables |
Installation of Server |
Testing of Server |
Data Integration |
System Development |
Testing |
Client |
I |
A |
A |
|||||||
Contractor (Goran) |
I |
R |
I |
I |
||||||
Quick Cables |
C |
R |
||||||||
Frida Systems |
C |
R |
||||||||
Project Manager |
C |
I |
R |
I |
A |
C |
A |
A |
||
Database Programmer |
R |
I |
C |
|||||||
Data Entry Officer |
I |
C |
||||||||
System Integrator (Shane) |
C |
R |
A |
|||||||
Technical Writer |
R |
|||||||||
Trainer |
||||||||||
Business Analyst |
R |
C |
A |
|||||||
Technical Officer |
C |
A |
I |
C |
A |
I |
||||
Tester |
A |
R |
R |
The budget for the project of SAP Business One Implementation for iPics includes the use of the resources and their utilization in the project. All the resources have some standard rate fixed for them. Hence, the standard rate of the project resources would be summed to form the completion of the project. The analysis of the individual project resources has helped in dividing the resources in human and material classification before calculating the project budget.
Resource Name |
Resource Type |
Work |
Standard Rate |
Cost |
Client |
Human |
24 hrs |
$0.00/hr |
$0.00 |
Contractor (Goran) |
Human |
40 hrs |
$165.00/hr |
$6,600.00 |
Quick Cables |
Human |
42 hrs |
$55.00/hr |
$2,310.00 |
Frida Systems |
Human |
8 hrs |
$180.00/hr |
$1,440.00 |
Project Manager |
Human |
96 hrs |
$195.00/hr |
$18,720.00 |
Database Programmer |
Human |
120 hrs |
$95.00/hr |
$11,400.00 |
Data Entry Officer |
Human |
80 hrs |
$60.00/hr |
$4,800.00 |
System Integrator (Shane) |
Human |
80 hrs |
$105.00/hr |
$8,400.00 |
Technical Writer |
Human |
48 hrs |
$95.00/hr |
$4,560.00 |
Trainer |
Human |
32 hrs |
$115.00/hr |
$3,680.00 |
Business Analyst |
Human |
16 hrs |
$130.00/hr |
$2,080.00 |
Technical Officer |
Human |
40 hrs |
$85.00/hr |
$3,400.00 |
Administrative Officer |
Human |
48 hrs |
$50.00/hr |
$2,400.00 |
Tester |
Human |
88 hrs |
$100.00/hr |
$8,800.00 |
Cables |
Material |
1 |
$45.00 |
$45.00 |
Cables Installation |
Material |
1 |
$6,145.00 |
$6,145.00 |
Hardware and Software |
Material |
1 |
$15,000.00 |
$15,000.00 |
Platinum Server |
Material |
1 |
$12,000.00 |
$12,000.00 |
Delivery of Server |
Material |
1 |
$3,000.00 |
$3,000.00 |
Construction Material |
Material |
1 |
$5,220.00 |
$5,220.00 |
Total Budget |
$120,000 |
The risk analysis can be done by making a risk register for analysing the factors of risk and forming the successive development of the project integration plan (Coppola, D’Ambrogio and Gianni 2016). The influence of the development of risk factor had laid on the fact that specific and crucial project risk assessment could be implemented. The risk analysis would help in identifying the potential risks of the project, classifying them on basis of likelihood and severity, and developing potential response against the project development. The risk analysis would involve the classification of the risk in likelihood (almost certain, likely, possible, unlikely, and rare) and severity (critical, major, moderate, minor, and negligible). The risk assessment is given below,
Risk name |
Risk Type |
Likelihood |
Severity |
Ranking |
Mitigation Strategies |
Shortage of resources |
Financial |
Unlikely |
Major |
3rd |
Getting some more investors or using some provisional budget allocated |
Overtime Issues |
Management |
Likely |
Minor |
5th |
Change Management Plan should be used |
Problems in system integration |
Technical |
Possible |
Major |
2nd |
Methodology for software development must be used |
Conflict with contractor |
Procurement |
Possible |
Moderate |
4th |
Proper Agreement Documentation must be done |
Service Delivery Infringement |
Operational |
Likely |
Critical |
1st |
Contractor should be contacted for service delivery |
The communication matrix for the project of SAP business one implementation in iPics is given below,
No.: 1 Communication Method: Progress Reports Target Audience: Client Purpose: Project progress Frequency: Weekly Owner: Project Manager |
No.: 2 Communication Method: Test Reports Target Audience: Developer Team Purpose: Testing results Frequency: Quarterly Owner: Tester |
No.: 3 Communication Method: Reports Target Audience: Accounts department Purpose: Estimation records Frequency: Monthly Owner: Budgeter |
No.: 4 Communication Method: System Design Document Target Audience: IT team Purpose: System Design Frequency: Once Owner: Designer |
No.: 5 Communication Method: Procurement Document Target Audience: Contractor Purpose: Contractor Agreement Frequency: Once Owner: Project Manager |
No.: 6 Communication Method: Resource Allocation Book Target Audience: Project Team Purpose: Work Division among team Frequency: Once Owner: Budgeter |
No.: 7 Communication Method: Report Target Audience: Client Purpose: Project Plan Proposal Frequency: Twice Owner: Planner |
No.: 8 Communication Method: Verbal Speech Target Audience: Project Manager Purpose: Project Initial Requirements Frequency: Once Owner: Client |
Coppola, D., D’Ambrogio, A. and Gianni, D., 2016. Bringing Model-based Systems Engineering Capabilities to Project Management: an Application to PRINCE2. In CIISE (pp. 6-15).
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management. Project Management Institute.
Heagney, J., 2016. Fundamentals of project management. AMACOM Div American Mgmt Assn.
Heldman, K., 2015. PMP project management professional exam deluxe study guide: updated for the 2015 Exam. John Wiley & Sons. Papke-Shields, K.E. and Boyer-Wright, K.M., 2017. Strategic planning characteristics applied to project management. International Journal of Project Management, 35(2), pp.169-179.
Hornstein, H.A., 2015. The integration of project management and organizational change management is now a necessity. International Journal of Project Management, 33(2), pp.291-298.
Jaferi, F., Parsa, M. and Sajadi, S.M., 2016. A Study on How to Improve PMBOK (Project Management Body of Knowledge) Guidelines Performance by Simulation. World Academy of Science, Engineering and Technology, International Journal of Industrial and Manufacturing Engineering, 3(1).
JOSEPH. PHILLIPS, P.M.P., CBAP, I. and PMP, C., 2018. PMP PROJECT MANAGEMENT PROFESSIONAL STUDY GUIDE. McGraw-Hill Education.
Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. John Wiley & Sons.
Leach, L.P., 2014. Critical chain project management. Artech House.
Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and techniques for the practicing project manager. John Wiley & Sons.
Permana, P.A.G., 2015. Scrum method implementation in a software development project management. International Journal of Advanced Computer Science and Applications, 6(9), pp.198-204.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Snyder, C.S., 2014. A guide to the project management body of knowledge: PMBOK (®) guide. Project Management Institute: Newtown Square, PA, USA.
Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), pp.278-290.
Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), pp.278-290.
Tomanek, M. and Juricek, J., 2015. Project risk management model based on PRINCE2 and SCRUM frameworks. arXiv preprint arXiv:1502.03595.
Turner, R., 2016. Gower handbook of project management. Routledge.
Verzuh, E., 2015. The fast forward MBA in project management. John Wiley & Sons.
Yung, C. and Lin, Y., 2015. Implementing TOAST, a Tool for Agile Software Project Management in Cloud Computing Environments. JSW, 10(11), pp.1310-1318.
Essay Writing Service Features
Our Experience
No matter how complex your assignment is, we can find the right professional for your specific task. Contact Essay is an essay writing company that hires only the smartest minds to help you with your projects. Our expertise allows us to provide students with high-quality academic writing, editing & proofreading services.Free Features
Free revision policy
$10Free bibliography & reference
$8Free title page
$8Free formatting
$8How Our Essay Writing Service Works
First, you will need to complete an order form. It's not difficult but, in case there is anything you find not to be clear, you may always call us so that we can guide you through it. On the order form, you will need to include some basic information concerning your order: subject, topic, number of pages, etc. We also encourage our clients to upload any relevant information or sources that will help.
Complete the order formOnce we have all the information and instructions that we need, we select the most suitable writer for your assignment. While everything seems to be clear, the writer, who has complete knowledge of the subject, may need clarification from you. It is at that point that you would receive a call or email from us.
Writer’s assignmentAs soon as the writer has finished, it will be delivered both to the website and to your email address so that you will not miss it. If your deadline is close at hand, we will place a call to you to make sure that you receive the paper on time.
Completing the order and download